My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010 FIRLAND PL 2016-01-01 MF Import
>
Address Records
>
FIRLAND PL
>
2010
>
2010 FIRLAND PL 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 7:38:03 AM
Creation date
2/10/2017 5:00:52 PM
Metadata
Fields
Template:
Address Document
Street Name
FIRLAND PL
Street Number
2010
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`� $ <br />,� •,� <br />`Y�� I7 <br />c'� <br />PUBLIC WORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425)257-8810 <br />Date: 11/18/2008 � <br />Public Works Permit #: PW0811-016 <br />Buildinq Permit #; <br />Planninq Reference #: <br />Public Works Fee $: <br />Other $: <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />ARNOLD DESMOND L 8 PAGE <br />�B�(��'IRLAND PL SE <br />EVERETT WA 96203 <br />PHONE: PHONE: <br />TAX PARCEL ID # 00500600001000 SITE ADDRESS: 2010 FIRLAND PL <br />DESCRIPTION OF PROPOSED WORK: <br />ROOF"fOP RUNOFF FORADDITION <br />C0811-009 <br />$ 25.00 <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Undernround Service 48 hrs before you dig. TOLL FREE NUMBER 811 �- <br />4. Rooftop runoff must be discharged to a roof downspout inflitration system per City of Everett Storm Manual <br />3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See attachment for more details. <br />5. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to beginning <br />the project. <br />6. Install erosion control m2asures as determined by the Public Works inspector, such as silt fence, straw bales, <br />swales or erosion blankets. <br />7. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />8. All excavated material from foundation, sidewalk and driveways shali be hauied to an approved, permitted site. <br />No wasting of material is allowed on this building lot. <br />9. No dirt, mud, rocks or debris to be tracked onto roadway. <br />`��`� ���- //-/y c8 <br />Appr ved for Construction Date <br />FINPL INSPECTION Date <br />Approved as Constructed <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/appl�can� hereby agrees lo hold and <br />save harmless the Cily of Everett irom any and all claims for <br />damages, cosls, expenses, or causes of action ihat may arise <br />because of installation and maintenance ot the improvement <br />or olher right-oi-way use herelo applied for and turther agrees <br />to remove same upon notice trom the City and to replace <br />pub' pertydamagedth y. <br />�� r" �- °/o <br />Signature of Applicant Date <br />WORK AUTHORIZED BY TH15 PERMIT h1UST BE STARTED WiTHIN 180 UAYS OF DATE PERMR IS ISSUED AND THEREAFfER 15 TO BE DILIGENTLY <br />PURSUED TO CODiPLEiION. THIS PERh1IT MAY BE CANCELLED BY THE CCfY UPO�� ANY STOPPAGE OF WORK ON THIS PROJECi OVER 90 DAYS DURATICN. <br />
The URL can be used to link to this page
Your browser does not support the video tag.