My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6011 FLEMING ST 2016-01-01 MF Import
>
Address Records
>
FLEMING ST
>
6011
>
6011 FLEMING ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 5:11:35 PM
Creation date
2/10/2017 5:44:16 PM
Metadata
Fields
Template:
Address Document
Street Name
FLEMING ST
Street Number
6011
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUB�IC WORKS PERMIT COMMENTS <br />Connect side sewer per City Standard ti&01. <br />Connect side sewer per City Standard #'s 601, 602, 604. <br />Connect ali roofti p downspouts to the side sewer. <br />Connect rooftop downspouts to the drainage system provided for this lot. <br />Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br />Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' Iong. See attachment for <br />more details. <br />� The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br />beginning lhe project. Call Randv Allen at 425-339-7403 I/ Call Cliff Lindman at 425-339-7404. <br />10. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br />bales, swales, or erosion blankets. <br />11. <br />12. <br />13. <br />14. <br />15. <br />� <br />16.; <br />�7. <br />18. <br />19 <br />20. <br />Install erosion control measures per City of Everett Standards for small parceis <br />Remove erosion control measures upon completion of the project prior to fnal approval of the permit. <br />All excavated material from foundation, sidewalk and driveways shall be Iiauled to an approved, <br />permitted site. No wasting of material is allowed on this building lot. <br />No dirt, mud, rocks or debris to be tracked onto roadway. <br />No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and <br />open for pedestrian travel. <br />Ndjust water meter box 1" above sidewalk grade. <br />Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A & 306 on <br />this proposal's frontage as directed by the Public Works Inspector (i.e. all unused driveways and any <br />broken or damaged area must be replaced). <br />Instali a Type I concrete driveway per City of Everett Standard #307. <br />Pave driveway from the front property line out to the street paving. <br />Pave to existing paving in alley. <br />21. Contact the _ <br />sewer services. <br />Water District for connecting provisions for this building's water and <br />22. P. catch basin as per Cily Standard Plan #402 with a gas trap per Standard Plan #410 is required for the <br />parking area. <br />23. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br />gravity flow across the public right-of-way. <br />24. A sprinkler system is required for this building in compliance with the requirements of NFPA Standards <br />13D. <br />; ��� <br />PWComments / Revised 618111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.