My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7815 E GLEN DR 2016-01-01 MF Import
>
Address Records
>
E GLEN DR
>
7815
>
7815 E GLEN DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2017 8:10:34 AM
Creation date
2/11/2017 8:10:25 AM
Metadata
Fields
Template:
Address Document
Street Name
E GLEN DR
Street Number
7815
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i ; " � �. <br /> GORPORATE OFFKE <br /> ��ASSOCIATED 911 FiNh Avenua,s��b ioo <br /> EARTH ja�s�e�np���98033 <br /> SCIENCES, INC F� (425�827-SA24 <br /> BAINBRIDGE ISL4ND OFFICE <br /> 179 Madrona lana North <br /> Bainbridga Island,WA 98110 <br /> (206�780-9370 <br /> Mazch 17, 2� FAX�206)780-9438 <br /> Project No. KE98375G <br /> c/o Mr. Jeff Steeves <br /> New England Homes, Inc. <br /> 8610 Mapiewood Lane <br /> Edmonds, Washington 98026 <br /> Subject: Geotechnical Plan Review <br /> Steeves Residence <br /> 105-�ar�era�anc� �"I g�s I, �� �.2.1'1 p�' <br /> Everett, Washington <br /> Dear ?v1r. Steeves: <br /> As requcsted, we have performed a geotechnical review of the plans for the above <br /> referenced site. These plans consist of Sheets 1 through 5, dated Mazch 11, 2000, <br /> prepared by The Leren Company, Inc. and include General Notes, Lower and Main <br /> Floor Plans, Details, Sections, Elevations, and a Foundation Plan. <br /> Upon completing our review of these plans, we offer the following comments. <br /> • Section C, Soil and Foundation Data, on Sheet 1 indicat.s a passive resistance <br /> of 300 pcf was used in the design of the foundation. This value should be <br /> changed to 250 pcf as recommended in Section 12.1 of our October 2, 1998 soil <br /> report. In addition, this section should be change:d to indicate that all footings <br /> should be founded upon the medium dense to very dense, natural, undisturbed <br /> soil and our October 2, 1998 soil report should be reference. <br /> • Three options were provided in our October 1998 soii report for consuuction of <br /> slab on grade floors. These included: excavation and replacement of all of the <br /> existing fill soils and loose, naturai sedimenGti under the slab area and <br /> replacement of these materials with structural fill, construction of a structural <br /> slab supported on drilled piers, and construction of a floating floor slab. <br /> Although it is apparent from the plans that a structural slab will not be used, it is <br /> not clear which of the other two options are to be utilized. This should be <br />
The URL can be used to link to this page
Your browser does not support the video tag.