Laserfiche WebLink
27. Footing and foundations shall extend below the frost line as required by UBC 2907(a). <br />28. Show location of under floor access crawl hole (18" x 24" min). (2515-c 2) <br />29. Show foundation walls extending a minimum of 6" above the adjacent finished grade. <br />(2907-a) <br />30. Show the maximum foundation wall height and the maximum backfill height. <br />31. Show the minimum cover of concrete protection for reinforcement. (2907-h) <br />32. Show drainage for the foundation. <br />...33. Show floor framing at fireplace. <br />...34. Specify all post/beam, post/footing, beam/beam connections. A positive connection is <br />required to resist uplift and lateral displacement. <br />In order for the processing of your application to continue, it will be necessary to provide the <br />Building Division with two complete new sets of drawings reflecting the corrections requested. <br />Upon resubmittal of the drawings, your application will be given priority and plan review will <br />recommence. <br />All required submittals shall be of sufficient detail and contain sufficient information to ensure that <br />the proposed structure will be constructed in compliance with all adopted codes. <br />Sincerely, A/-Q-- <br />Jeff Heilman <br />Development Technician <br />ih/(45140) <br />