Laserfiche WebLink
that will supply the sprinkler system. <br /> Aboveground sprinl:ler piping shali be .iydrostatically tested as established in NFPA Standard 13. <br /> Underground piping shall be hydrostatically tested and flushed as established in NFPA Standard 24 <br /> for private fre mains. All such tests shall be wimessed by a Fire Dcpartmcnt inspcctor. Call (425) <br /> 257-5123 to make an appointment for inspection. <br /> Contractors' materials and test certificates shall bc submitted to the Gverett Fire Dcpartmcnt prior to <br /> issuance of any Cenificates of Occupancy. <br /> Call (425) 257-8123 for more information. <br /> 2�. Fire Safetv- Fire safety practices during construction shall be in compliance with Articic 87 of the <br /> Uniform Fire Code. <br /> s <br /> 26. The City of Everett prohibits outdoor buming. Thereforc, outdoor buming for the purpose oC <br /> disposing of construction debris or nibbish�vill not bc permitted. <br /> 27. The �Vashington State Clean Air Act requires the use oCall laiown, available, and reasonable means <br /> of controlling air pollution, including dust. Dust generatcd during construction activities can be <br /> controlled by�ve[ting those dust sources such as areas of exposcd soils, washing truck whcels beforc <br /> they leave Aie site, and installing and maintaining gravel construction cntrances. Construction vehicle <br /> track-out is also a major dust source. Any evidence of track-out can trigger violations and fines !'rom <br /> the Department of Ecology or the Puget Sound Air Pollution Control Agency. <br /> GENERAL INFORMATION <br /> 1. Puget Sound Energy is the natural gas provider in Aiis arca. To initiate new service orders, please <br /> contact Marilyn Davis Westlund at (425)356-7512 at least 90 days prior to the required in-servicc <br /> date. <br /> Any relocation of existing gas facilities for this development wil( be at die developer's sole expense, <br /> and requires 90 days minimum notice. Please contact Elaine Babby at (206)224-2018 to coordinate <br /> relocation requests. <br /> 2. The Snohomish County PUD currently has sufficient capacity to serve the proposed development. <br /> For further information about t�•c ,; ::;trical servicc requirements for this project, please call Kurt <br /> Manin of the District's Cur -::cr Engineering Office, Everett at 253-82I1. <br /> 3. GTE Northwest Incorponted has fl:c,?ities near this location. However, any building entrances must <br /> be coordinated at least 60 days in adva;ice. The cost of any rclocation of GTE facilities that is <br /> required to construct the new apartments will be at the total espense of the developer. Any relocation <br /> will take 60 to 120 days. Please contact DeUUie Condron, Engineer-OSP at 356-4053 if you have any <br /> questions rcgarding this building cntrancc. <br /> G <br /> �<_ � <br />