My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2915 FULTON ST 2016-01-01 MF Import
>
Address Records
>
FULTON ST
>
2915
>
2915 FULTON ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2017 3:15:54 PM
Creation date
2/11/2017 3:15:36 PM
Metadata
Fields
Template:
Address Document
Street Name
FULTON ST
Street Number
2915
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
that will supply the sprinkler system. <br /> Aboveground sprinl:ler piping shali be .iydrostatically tested as established in NFPA Standard 13. <br /> Underground piping shall be hydrostatically tested and flushed as established in NFPA Standard 24 <br /> for private fre mains. All such tests shall be wimessed by a Fire Dcpartmcnt inspcctor. Call (425) <br /> 257-5123 to make an appointment for inspection. <br /> Contractors' materials and test certificates shall bc submitted to the Gverett Fire Dcpartmcnt prior to <br /> issuance of any Cenificates of Occupancy. <br /> Call (425) 257-8123 for more information. <br /> 2�. Fire Safetv- Fire safety practices during construction shall be in compliance with Articic 87 of the <br /> Uniform Fire Code. <br /> s <br /> 26. The City of Everett prohibits outdoor buming. Thereforc, outdoor buming for the purpose oC <br /> disposing of construction debris or nibbish�vill not bc permitted. <br /> 27. The �Vashington State Clean Air Act requires the use oCall laiown, available, and reasonable means <br /> of controlling air pollution, including dust. Dust generatcd during construction activities can be <br /> controlled by�ve[ting those dust sources such as areas of exposcd soils, washing truck whcels beforc <br /> they leave Aie site, and installing and maintaining gravel construction cntrances. Construction vehicle <br /> track-out is also a major dust source. Any evidence of track-out can trigger violations and fines !'rom <br /> the Department of Ecology or the Puget Sound Air Pollution Control Agency. <br /> GENERAL INFORMATION <br /> 1. Puget Sound Energy is the natural gas provider in Aiis arca. To initiate new service orders, please <br /> contact Marilyn Davis Westlund at (425)356-7512 at least 90 days prior to the required in-servicc <br /> date. <br /> Any relocation of existing gas facilities for this development wil( be at die developer's sole expense, <br /> and requires 90 days minimum notice. Please contact Elaine Babby at (206)224-2018 to coordinate <br /> relocation requests. <br /> 2. The Snohomish County PUD currently has sufficient capacity to serve the proposed development. <br /> For further information about t�•c ,; ::;trical servicc requirements for this project, please call Kurt <br /> Manin of the District's Cur -::cr Engineering Office, Everett at 253-82I1. <br /> 3. GTE Northwest Incorponted has fl:c,?ities near this location. However, any building entrances must <br /> be coordinated at least 60 days in adva;ice. The cost of any rclocation of GTE facilities that is <br /> required to construct the new apartments will be at the total espense of the developer. Any relocation <br /> will take 60 to 120 days. Please contact DeUUie Condron, Engineer-OSP at 356-4053 if you have any <br /> questions rcgarding this building cntrancc. <br /> G <br /> �<_ � <br />
The URL can be used to link to this page
Your browser does not support the video tag.