Laserfiche WebLink
� � � <br /> 8. ��ovide detail(s) for guard at landing on main Floor and (if appiicable) along stairs at <br /> second Floor. <br /> 9. Handreils shall be returned to the wall (no gap permitted). <br /> 10. All new glazing to comply with Table 6-1 WSEC. Revise window schedule to reflect <br /> requirement. <br /> 11. Sheet AF1.2 shows a 4 x 8 D.F. #1 beam, designated "BS" that is 12 feet long. The <br /> calculations for"85" show a S foot span. Flease correct. <br /> 12. Provide ledger details in section and elevation. The tip of lag screws shall fully extend <br /> beyond the inside face of the band joist. Ledgers shall be Flashed to prevent water from <br /> contacting the house band joist. Show on plans. <br /> 13. Provide roof framing plan. Show how cciling joists in master bedroom are supported. <br /> 14. Proved detai! showing how existing roof rafters are supported by new g�rder truss at <br /> proposed master bathroom. <br /> Please prepare a response fetter showing where each item in this correction letter is <br /> addressed on the plan set. <br /> Upon resubmittal of the drawings, your application wili be given priority and plan review will <br /> recommence. <br /> All required submittals sliall be of sufficient detail and contain sufficient information to ensure <br /> that the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> ����-- <br /> / <br /> Je�f Heilman <br /> C..mlopment Technician <br /> 425-257-8976 <br /> Email: tl ieilm_an�ci.everett.w�.us <br /> �'IZ <br /> S:�ICommon\OerirelVMrdman�C1307�007(47�0 Gard�cr Ave)7�oc <br />