Laserfiche WebLink
J I <br /> �. i <br /> /�/BL/C N/O/�KS i <br /> � <br /> , <br /> ..,. .:. <br /> �990 fr-Gio j <br /> � <br /> MEMORANDUM I <br /> � <br /> �, <br /> TO: James DriswU, Hearing Examiner <br /> FROM: Kirk Brooks, Engineering & Public Services <br /> DATE: Dececfiber 16, 1999 <br /> SUBJECT: Srormwater Best Management Practice (BMP) <br /> for ongoing construction at 4724 Gardner Ave. <br /> The following procedures are those noted during the hearing I attended on December 16'h, <br /> 1999. They are intended to provide some temporary relief for construction impacts for this <br /> project. <br /> • Clean up sediment sand and dirt that has been deposited on the adjacent lots <br /> (Dickenson property). This should be done so as to restore the azea to provide the <br /> previous use the owner had. <br /> • Cover existing piles of dirt at the construction project with a 2" (rninimum) Iayer of <br /> straw to help reduce erosion and sedimentation. <br /> • Revise the location of the discharges for de-watering of the foundation area. When de- <br /> watering, pump water to edge of Gardner avenue so that water flows south t� the city <br /> catch basin at the edge of the street. Install and maintain a filter fabric insert in the <br /> catch basin grate to help stop sediments from entering the city's drainage system. � <br /> CITY OF EVERETT•3200 Cedar Street • Everett,WA 98201 • (425) 257-8800 • Fax(425)257-8856 <br />