My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4935 GLENWOOD AVE 2016-01-01 MF Import
>
Address Records
>
GLENWOOD AVE
>
4935
>
4935 GLENWOOD AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2017 6:35:25 PM
Creation date
2/11/2017 6:35:11 PM
Metadata
Fields
Template:
Address Document
Street Name
GLENWOOD AVE
Street Number
4935
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> . . � <br /> � Jordan Construction JN 00284 ' <br /> July 25, 2000 Page 3 <br /> dense till. Based on this, it is our opinion the proposed residence can be constructed on <br /> conventio��al foundations, or on lean-mix (1 1/2 sack) concrete placed above these dense native <br /> soils. Overexcavation may be needed to reach the competent bearing material. <br /> Based on the location and elevation of the residential footprint, the existing rockery should not be <br /> impacted by the construction of this residence. The footprint of the residence is 30 feet from the <br /> top of the rockery at its ciosest point. No additional fill should be placed on the s�ope above the <br /> rockery. It is cur opinion that the slope is stable and will remain so if no fill is placed on the slope. <br /> The proposed 30-foot setback from the rockery is adequate. <br /> The existing septic system within the proposed footprint of the residence will need to be removed. <br /> The depth and make up of the septic system is unknown. It the tank is located in the foundation <br /> areas, it should be removed and replaced with controlled density fill (CDF). <br /> The erosion control measures needed during the site development will depend heavily on the <br /> weather conditions that are encountered. We anticipate that a silt fence will be needed around the <br /> downslope side of any cleared areas. Following rough grading, it may be necessary to mulch or <br /> hydroseed bare areas that will not be immediately covered with landscaping or an impervious <br /> surface. <br /> Geotech Consultants, Inc. should be allowed to review the final development plans to verify that the <br /> recommendations presented in this report are adequately addressed in the design. Such a plan <br /> review would be additional work beyond the current scope of work for this study, and it may include <br /> revisions to our recommendations to accommodate site, development, and gectechnical <br /> constraints that become more evident during the review process. <br /> We recommend including this report, in its entirety, in the project contract docun�ents. This report <br /> should also be provided to any future property owners so they will be aware of our findings and <br /> recommendations. <br /> CONVENTIONAL FOUNDATIONS <br /> The proposed structure can be supported on conventional continuous and spread footi.igs bearing <br /> on undisturbed, dense, glacially deposited, gravelly, silty sand (glacial till) native soil, or on <br /> structural fill, or on lean-mix (1 1/2 sack) concrete placed on this competent, native soil. See the <br /> later sub-section entitled GENERAL EARTHWORK AND STRUCTURAL F/LL for <br /> recommendations regarding the placement and compaction of structural fill beneath structures. <br /> Adequate compaction of structural fill should be verified with frequent density testing during fill <br /> placement. We recommend that continuous and individual spread footings have minimum widths <br /> of 12 and 16 inches, respectively. They should be bottomed at least 18 inches below the lowest ' <br /> adjacent finish ground surface. The local building codes should be reviewed to determine if <br /> different footing widths or embedment depths are required. Footing subgrades must be cleaned of <br /> loose or disturbed soil prior to pouring concrete. Depending upon site and equipment constraints, <br /> this may require removing the disturbed soil by hand. <br /> Depending on the final site grades, some overexcavation may be required below the footings to <br /> expose competent, native soil. Unless lean concrete is used to fill an overexcavated hole, the <br /> overexcavation must be at least as wide at the bottom as the sum of the depth of the <br /> GEOTECH CONSULTANTS,INC. �(J <br />
The URL can be used to link to this page
Your browser does not support the video tag.