Laserfiche WebLink
-r <br /> 'R " " _ <br /> . ..i._ .. __�.� <br /> i�1 , <br /> I J <br /> 't <br /> � <br /> , 8. That Phase I development be in conformance with the final site plan <br /> presented to the Plann'ng Commission on July 8, 1980, i�duding the <br /> � modular structure proposed for short term use. Phase II, which wilt <br /> � indude the new sanctuary (building location shown on fina! site plan), --, <br /> shall be presented to the Planning Commission and City Council in the <br /> i future for review of specific design elevations. <br /> � 9. That the portions of the site that have been cleared in the last year <br /> and are not immediately developed as part of this plan shall be hydro- <br /> seeded to stablize the slopes. Also, any areas disturbed as part �f this <br /> development and not planted in formal landscaping shall be hydro- <br /> seeded within one month of disruption. <br /> AND, BE IT FINALLY ORDERED, that a copy of this written order be <br /> ' transmitted to the Applicant for their information. <br /> I � <br /> �1 / �i� <br /> i <br /> Date of Action: July 23, 1980 ���%�'/ � '! -, "�7�'- �.�'�'�° ���� <br /> D"ennis L. Derickson, Secretary <br /> iCity of Everett Planning Commission ' <br /> I ' <br /> i ' <br /> I <br /> I <br /> � <br /> ' i <br /> I I� <br /> i , <br /> i � � <br /> I <br /> j � <br /> � - <br /> I <br /> � <br /> ; <br /> I <br /> � <br /> I <br /> I � <br /> � <br /> � � <br /> . <br />