My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4701 W GLENHAVEN DR 2016-01-01 MF Import
>
Address Records
>
W GLENHAVEN DR
>
4701
>
4701 W GLENHAVEN DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2017 8:24:54 PM
Creation date
2/11/2017 8:24:29 PM
Metadata
Fields
Template:
Address Document
Street Name
W GLENHAVEN DR
Street Number
4701
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> October 15. 1980 <br /> Pro�ect No. 8010-1 ' <br /> gi-Win Homee <br /> Page 2 <br /> of the existing site grading will be pexformed to accommodate <br /> the £oundation soils configuration and condition. We �mder- <br /> stand that eacavation for placement of the framed floor eyetem <br /> within the living areae will be controlled by the encountered <br /> eoil conditiona and etructural or economic conaiderationa. It <br /> ie also underatood that the contrac+.or will modify or dreea <br /> the steep elope to the northeast of the dwelling, and that <br /> conaideration is being given to the use of additional artifi- <br /> cial fill for yard apace in that area. A rockery sys�em is <br /> at present being considered within the fill area. <br /> Authorization for our study was granted by Messrs. Gary Haretad <br /> and Ricic Jones, acting Sn behalf of Ki-Win Homes. <br /> PURP05E AND SCOPE <br /> The purpose of our study is to determine the type(e) , apatial <br /> dietribution, and character of the foundation and slope soils <br /> occurring within the site and areas ad�acent. Based upon our <br /> gindings, opiniona and recommendations regarding aoils related <br /> design criteria and slope atability will be offered. In addi- <br /> tion� recommended procedurea and specifications for the earth- <br /> work and general construction phases will be outline�l �ahere <br /> relevant. <br /> The acope of our study included a thorough viaual aite inap- <br /> ection and the placement of three (3) backhoe test pits along <br /> and ad�acent to the down slope (northeast) margin of the build- <br /> ing aite (please see the accompanying teat pit location map) . <br /> - 911 test pita were excavated using a rubber tire mounted back- <br /> hoe. The field teating and inspection were accomplished on <br /> • October 13, 19� �der the supervi3lon of W.I,.Bicket, staff <br /> engineering geologist from this office. Classification of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.