Laserfiche WebLink
:NDUM TO FHA COMMITMENT FLV, CASE NO. 561-303220-221 <br />iTI�OF 2 ADDRESS 2313 Lblucbia Ay mzc <br />Dec $2_j.m6 Everett. Washington <br />:ific commitment conditions (applicable when checked) <br />_. All required repairs must be completed in a professional manner. <br />All certifications and/or pest control certificates of completion must be submitted before <br />requesting final inspection of repairs. Note: If VC-15 is required, it is recommended <br />this certificate be obtained before anv other certifications are obtained and anv repair <br />11 Q If property is sold under Section 221(d)(2) a certificate of compliance with the <br />minimum housing code will be required prior to request for inspection of other addendum <br />requirements. If there are no addendum requirements, the certificate may be submitted <br />with closing documents. <br />12 © Submit certification from the local authority having jurisdiction that the subject <br />property is in compliance with the Local Minimum Housing Code. <br />13 0 Submit certification from a state licensed pest control operator that wood destroying <br />organisms, fungus and/or'rot damage in all of the dwelling, interior and exterior, have <br />been eliminated. Attach list of any repairs or corrections completed in connection <br />with above certification. A "Standard Notice of Work Completed" or a report form <br />indicating no infestation may be submitted as certification. Note: All repairs must <br />be completed in a professional manner and in compliance with local building codes. <br />14 ® Q (a) This commitment is subject to receipt of clear certificate(s) for (electrical, <br />plumbing, roofing, and heating). The required certificate(s) is (are) being ordered <br />and will be paid for by HUD. Cost of additional certificates or required repairs shall <br />be borne by the Seller. <br />® (b) Reinspection to examine the following system(s) not in operation at the time <br />of our appraisal is required. Please notify the Valuation Branch of this office in <br />writing when ready for inspection: <br />© plumbing 0 heating 0 electrical <br />Correction of any deficiencies found is a specific condition of this commitment. <br />Indicated system(s) shall be operable and inspection completed prior to the request <br />for conversion to a firm commitment. <br />15 Q Furnish evidence from the local health t,ithority indicating approval of the <br />Q individual water supply system, O individual sewage disposal system. <br />It is recommended the above evidence of approval be obtained before comment: <br />other reauired repair work. <br />16 L7 <br />O (a) Re -roof Q dwelling and/or Q garage with minimum 235# self sealing composition <br />shingles or #1 cedar shingles, and repair sheathing and install new flashingc as necessar� <br />Remove all old roofing when two or more 8 layers exist. (b) Repair roof of � dwelling and/or L/ garage to an acceptable condition. <br />(c) Re -roof built-up roof: After removing all old roofing, install min. 3 ply -hot <br />mo <br />27ed 15# felt roof with flood coat and 400({ gravel per 100 sq. ft. <br />(d) Repair built-up roof: Remove all gravel and counter flashing from roof, clean <br />surface to accept hot mop. Provide minimum 15 lb. felt, hot mopped and flood coated. I <br />Replace gravel and flashing and properly seal all gutters and apertures. <br />.17 Q Paint all exterior metal and wood trim of ® house and/or i�] garage after adequately <br />preparing surface. In rooms with openable windows, at least one must be free and oper <br />•18 G7 Paint entire exterior of L/ house and/or 0 garage including trim. Prepare surface <br />by repairing all damaged and deteriorated areas, remove all loose paint and blisters and <br />apply an undercoat to all bare wood. In roans with openable windows, at least Une must <br />be free and operable. <br />•19 ® remove the existing floor covering in the following rooms: bathroom <br />Replace with new resilient floor covering over suitable underlayment after making <br />necessary repairs to subfloor. <br />•20 0 Submit statement from purchaser acknowledging wall-to-wall carpet as the finished floor <br />in the 0 kitchen Q bathroom. <br />TUMBLE <br />. rnrm .LJ19-Q-113 (Rev. 8-1-75) <br />