Laserfiche WebLink
City Atto�•ney 's Office <br /> MEMORANDUM <br /> TO: Tim Tyler, Building Ofticial <br /> FROM: Laura Van Slyck, Assistant City Attorney <br /> DAI'E: February 16, 2000 <br /> SUBJECT: City of Everett v. Diane French <br /> 5718 Commercial Avenue <br /> Diane French is the owner of property located at 5718 Commercial Avenue. She has had <br /> a detached garage built on her property. The garage was built in a manner that does not <br /> comply with the plans that were approved. I'm not sure about all of the technical details, <br /> but one aspect ofthe noncompliance with the plans seems to be that rhe plans showed a <br /> flat lot, and the garage as built is not on a Flat lot. The permit was issued 10/17/97 <br /> (#856787). <br /> In January of 1998 the neighbor to the north ofMs. French's property, John Ritchie (sp?), <br /> complained that the garage is over the allowable Zl feet in that zone. On February 3, <br /> 1998 Steve Ingalsbe and Jeff Heilman went to the site to check the height of the garage. <br /> They found that the garage was approximately 22 inches over the maximum height. The <br /> contractor was notified that he should not continue working and that the owners should <br /> be notified. The trusses were in place on top of the walls, but no roof sheathing had been <br /> installed on either roof. The contractor was told that the lo�ver roof would be within the <br /> allowable height restriction, but the upper roof would have to be lowered. The contractor <br /> was told that the Ms. French would have to submit revised drawings to show compliance <br /> with the zonin� code. <br /> On February 12, 1998 Jeff Hcilman sent a letter to b1s. French advising her that the <br /> garage as built appeared to not comply with the approved plan and appeared to exceed <br /> the allo�vable height of detached accessory buildings. He stated that the letter would <br /> serve as a Stop Work Order as set forth by the State Building Code and told her she <br /> would need to contact either [ngalsbe or Heilman to discuss the options for resolution. <br /> In June of 1998 you and Heilman went to the site and noted that the garage appeared to <br /> be finished. On June 16, 1993 you sent a memorandum to Michael Weight, City <br /> �L <br />