Laserfiche WebLink
provided that the improvemenls necessary to support the particular building or <br /> facilily are completed to the City's satisfaclion. Those improvements include, but <br /> are not limited to, parking, ulilities, fire access, and landscaping. Phasing <br /> requiremenls of public access improvements are addressed in Condition #25 <br /> below. <br /> 6. Prior lo issuance of a building permil, the location of propeAy lines shall be <br /> provided to the City to ensure buildings satisfy minimum setback and <br /> construction standards. <br /> 7. Prior to issuance of a building permit, the Applicant, or its agents, shail provide <br /> calculations in square feet of each use qtegory idenlified in Section 3.5 of lhe <br /> Development Agreement. These calcula6ons sliall be updated with each <br /> building permit lo ensure that lhe parameters set forth in Section 3.5 are not <br /> exceeded. <br /> Construction Imoacts and Gradina (aeolies to facilitv construction and anv future <br /> maintenance) <br /> e. Cl�y streets and alleys are to be kept clear of dirt and debris at all times during <br /> construclion. Dust suppression and slreet cleaning must occur as directed by <br /> the Public Works inspector. <br /> 9. Temporary erosion control measures for consiruction aciivity must be operational <br /> prior to commencement of any clearing or earthwork. <br /> Stormwater and Waler Qualilv <br /> 10. Prior to dfscharge of the stormwater irom the site, lreatment of stormwater runofi <br /> from paved areas is required per City slandards. Stormwater treatmeni is <br /> required if 5,000 square feet or more of pavement is created and/or redeveloped <br /> by a projeci. <br /> 11. All stormwater facilities shall be designed in accordance with applicable City <br /> standards and/or design policies. <br /> 12. The project should utilize the Best Management PracUces listed In 5ection 2.2 <br /> Pollutant Source-Specific Best Management Praclices for the repair and <br /> mainlenance of boats and ships, found in the 2001 DOE StormwalPr <br /> Managemenl Nfanual for Wesiem Washington. <br /> 13. The oplions for storm waler treatment for this project are: <br /> a) an infiltration basin, if suilable soils exisl on ihe site <br /> b) a wetpond <br /> c) a conslructed wetland <br /> �d) a 5MI SlormFiller, with slormwater preUeatment � <br /> 14. All chemicals or procl���ts of a tiazardous or toxic nature that may be used or <br /> slored on the site musi be slored under cover and isolated from the storm <br /> drainage system. The Applicanl must develop opera!fonat procedures lo address <br /> the handling and slorage of fuel, chemicals, oil and other substances wilh <br /> notentiai for spillage into adjacenl waters. The Applicant, or its agents, shall <br /> dE•✓elop operalional procedures lo handle pote,itial spills into adjacenl waters. In <br /> addili�n, physical structures, which would conlain any polential spills, shall be <br /> ,6 ��3 <br />