My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1205 CRAFTSMAN WAY BOATYARD EXPANSION 2016-01-01 MF Import
>
Address Records
>
CRAFTSMAN WAY
>
1205
>
BOATYARD EXPANSION
>
1205 CRAFTSMAN WAY BOATYARD EXPANSION 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2017 12:47:29 AM
Creation date
2/12/2017 12:46:50 AM
Metadata
Fields
Template:
Address Document
Street Name
CRAFTSMAN WAY
Street Number
1205
Tenant Name
BOATYARD EXPANSION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Port of E �erett <br /> Hydrologic and Hydraulic Report <br /> This report is provided as a summary of all methods anJ proced.ves used for analyzing <br /> thc drainage areas and structures for the proposed Craftsman District Bauryard <br /> Development project, in accordance with the City of Everett's (COE) best management <br /> practices (BMP's) requiremcnts for Drainabe Plans. Calculations and supporting <br /> documentation are providcd in Ihe attached appendices. <br /> Stormwater Site Plan <br /> I. Project Overview <br /> The proposed Craftsman District site is located to the Northwest of the intcrsection of <br /> West Marine View Drive and Craftsman Way. The Phase 2 Craftsman District Boatyard <br /> Development for the fort of Everett (Evcrett, WA) is subdividcd into two components <br /> based on usage and includes the following; 1) Access roads and parking; 2) Boat work <br /> yard. Stormwater from each of thesc usage areas is collected in separate conveyance <br /> systems and will each be cquipped with a different rypc of storn»vatcr t��ahnent. A <br /> sununary is provided bclow for cach usagc arca. <br /> Access and Parkine <br /> The parking lot locatcd to the Northeast of the intersection of I" Avc and Craftsman Way <br /> is to Uc rcconfigured to improve parking lot capacity and traffic circulation. The <br /> stornnvater drainage system for this parking lot has not been modiGed and drainage from <br /> these arcas is collected and conveyed to the 2°`� Avc stormwater trcatment system, <br /> consisting of a Stornil'iltcr trcaunent system, designed by RMI, and is to then bc <br /> dischargcd through an existing outfall locatcd on 2"`� Ave that ouUct's into the marina <br /> basin. Thc system design for the Stormfilter is providcci under a scpmatc permit <br /> submittal to the COG (sce NorUi Marina Redevelorment Infrashvcture Phasc I by RMI) <br /> and includcs thc requircd runo(f from this arca. <br /> 13oat Work Yard <br /> Thc proposcd Phasc 2 boat work yarcl will providc un additional 1.97 acres of ncw work <br /> arca. Stonnwuter drainage for this new work area will be convcyed to a modificd <br /> combined undergrourd detention systcm which will attenuate thc runoff treatment <br /> volumc af thc 2-ycar, 24-hour storm with an cxisting orificc sizcd to discharge at a ratc of <br /> Icss than 35 gpm. Thc dischurgc I'rom the orificc will bc dirccicd into thc cxisting <br /> scwage pump station along with the building sewagc them pumpcd to the COE combincd <br /> scwcr systcm locatcd in Wcst Marinc Vicw Drivc. Runoff gcncratcd from storm cvents <br /> cscccding thc 2-)'c.u•. _'�l-hour storm ��ill bypass thc pump stntion and divcrtcd dircclly <br /> ihruu�sh thc c.rititim� uuU:ill sh,uc�l h�� ihc parking lut .m�l 3n�1 r\��c stonr�.vatcr syzt�ms. <br /> - I - <br />
The URL can be used to link to this page
Your browser does not support the video tag.