Laserfiche WebLink
PORT OF EVERETT SECTION 02510 <br /> NORTH MARINA REDEVELOPMENT WA'TER DISTRIIIUTION <br /> SHAI.1-OW SOIL VCP CLEANt3P ACTION <br /> 2. Install metec valve,dcain,piping,and bypass. <br /> 3 Install p]ping thzough vault without meccr or isolation valvcs. <br /> Restiain all joints and scn+ice pipe joincs from main to downsffeazn <br /> cnd of bypass. Ciry of Everett will cut pipe in vault and install meter. <br /> 4. Coocdinate with Ciry of Everett foc meter installatio�. <br /> 5, piovide support for city pecsonnel as required by Ciry. <br /> G. Pield route dcain to storm dcain. Provide check valve on drain lina <br /> D4. Reduced Pcessute Backflow Assembly (RPBA)—Above Grade Installadon in <br /> Hot Box: <br /> ]. Coocdinace location of concrete pad foc RPBA with Engineer. Fidd- <br /> adjust location as directed by Enginecr. <br /> 2. Consuuct piping plumb and level. <br /> 3. Pzovide concrete pad per manufactucer's recommendarions. Secuce <br /> hot box to slab. <br /> 4. Install hot box per manufacrurec's recommendarions. <br /> 5. Pcoeide hcat mce and electric power service. <br /> I•1. Fire Hydrants: <br /> 1. Install per City of Lverctt requiremrnts. <br /> 2. Mark all fire hpdcants not in scn�icc by covering u�ich buclap sack. <br /> O. Irrigarions Sleeecs: <br /> 1. Field-adjust locarion to avoid �onflicts with ocher utiliti�s. <br /> 2. Backfill with stsucmral fill. <br /> 3. Extend to 3 feet beyond edge of concrete pavement. <br /> 4. Plug er.ds with PVC plug or eap. <br /> o1s10-13 �J,y�RqCT RECORD <br /> DOCUMENT <br />