Laserfiche WebLink
PORT OF EVERETT SECI'ION 02510 <br /> NOR'TI-I NfARINA REDEVELOPMENT WATER DISTRIBUTION <br /> gI-IALLOW SOII.VCP CLF.ANUP ACTION <br /> 5. Mark buued cnds w�th 2 x 4 extending from slewe invert to 2 feec <br /> above grade. Paint above grade poition white and mazk"IRR <br /> SLEEVL"with black paint. <br /> 3.04 FIELD QUALITl' CONTROL <br /> A. Comply with Secrion 01400. <br /> B. Comply with uty of Everett Requircments. <br /> C. Compaction Testing:Per Secrion 02327. <br /> D. Enginea Inspection:After completion of pipe,valves, fittings and bedding, <br /> buc befoce backfilling. <br /> 3.05 PRFSSURE TESTS <br /> A. Comply u�ith City of Evecett mquirements. <br /> B. Noti[y City of Everett and Engineer 48 hours pcior to required inspection <br /> time. <br /> C. Provide all test equipmmt and pecsonnd to prepare for and pecform test. <br /> D. Comply with Secrion 01400. <br /> G. Pccssure Tests: Backfill pipeline sufficiendy co prevent movemenc of pipe <br /> u�der pressure. Place reacrion blocking and allow concrete to cure and reach <br /> specified st�ength before testing. Repair damage due to failures at no cost r� <br /> Poct. <br /> P. Fumish pumps,test gages,plugs, saddles,corjwration stops,miscellaneous <br /> hose,piping,and othec equipment necessary to fill pipeline with water and <br /> complece hydcostatic test Pucnish 4.5-inch minimum diameter tesc gage <br /> having 0 to 300-psi range with '/� oE 1-peccent accurncy accompanied with <br /> cemfications of accuracy from a laboratory approved by Engineer. Fill watcr <br /> main only through a back flow prevention device supplied by Contraccor and <br /> �PProved by City oE�verctt. <br /> G. Prior to tcsting, fill pipeGne�vich water and allow to stand under pressure <br /> suf6cicnt rime to allow escape of aic and,if applicable,allow pipe lining co <br /> absorb water. <br /> 02510-14 CONTRACT RECORD <br /> DOCUMENT <br />