My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1205 CRAFTSMAN WAY PORT INFRASTRUCTURE 2016-01-01 MF Import
>
Address Records
>
CRAFTSMAN WAY
>
1205
>
PORT INFRASTRUCTURE
>
1205 CRAFTSMAN WAY PORT INFRASTRUCTURE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2017 12:53:14 AM
Creation date
2/12/2017 12:52:51 AM
Metadata
Fields
Template:
Address Document
Street Name
CRAFTSMAN WAY
Street Number
1205
Tenant Name
PORT INFRASTRUCTURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> PORT OF EVERET'T SEC'I'ION 02321 <br /> NORTH MARINA REDEVELOPMENT EXCAVATING,BACI�ILLING,AND <br /> SHALLOW SOIL VCP CLEANUP ACTION COMPACTING FOR UT�TIEG„I,SuktES <br /> dimension u�thin 6 inches of pipe. Rcmove matedal of this type <br /> fcom uench bottom and replace with foundation gravel. <br /> 6. Should excavation be carcied below lines and grades as shown <br /> because of uenching opccations,backfill such exwvated space to <br /> proper elcvarion as dicected by Engineez,at no additional cost to <br /> Poa. <br /> E. Trench ucavarion in Fill arcas: <br /> 7. Place fill co minimum one foot above proposed top of pipe or <br /> conduit 1�(/here vehicle traffic will traf�c over proposed pipe route, <br /> inuease minimum fill over top of pcoposed pipe to comply with Pipe <br /> Manufacturci s cecommendation for vehicle. Excavate trench afrer <br /> 6ll is placcd as noted. <br /> F. Control of��7aur. <br /> ]. Keep excavation free from water. Dewater as necessary. <br /> 2. Dcwatering system shall be Contrattoi designed,consttucced, <br /> operated,and mainrained. <br /> 3. Diccct diainage au�ay from excavation. <br /> 4. Grade rop perimetu of excavation to prevent sucface watec &om <br /> drnining into escavauon. <br /> 5. Direct runoff and watec Erom encering into sedimentation uaps. <br /> Provide addidonal filtration necessary to prevent silt ladcn watcr <br /> from leaving the site. <br /> 6. Do not allow silty water to cntec storm drain system or adjarcnt <br /> watcnvay. <br /> 7. Obtain appcoval fzom Ciry of Evecett for discharge to Cin• sar.ican• <br /> scwer and comply with Ciry conditions for dischazge. <br /> 8. Remove grit from u�arer:o be discharged to ciry� sanitary sewcr. <br /> G. Pipe Bedding: <br /> 1. Place bedding on approeed aench bottotn before pipe is installed_ <br /> Spread smoothly to support pipe uniformly. Do not use blocking to <br /> ozsal-� CON��MENT RD <br />
The URL can be used to link to this page
Your browser does not support the video tag.