My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1205 CRAFTSMAN WAY PORT INFRASTRUCTURE 2016-01-01 MF Import
>
Address Records
>
CRAFTSMAN WAY
>
1205
>
PORT INFRASTRUCTURE
>
1205 CRAFTSMAN WAY PORT INFRASTRUCTURE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2017 12:53:14 AM
Creation date
2/12/2017 12:52:51 AM
Metadata
Fields
Template:
Address Document
Street Name
CRAFTSMAN WAY
Street Number
1205
Tenant Name
PORT INFRASTRUCTURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT SECTION 02321 <br /> NO itTH MARINA 1tEDEVELOPMENT EXCAVATING,BACKFILLING,AND <br /> SHAL1-OW SOIL VCP CLEANUP ACTION COMPACTING FOR UT�i I�� <br /> adjusc pipe to gcade. Dig holcs foc bells as requued in ordcr to <br /> cnsure unifortn support along pip�harreL <br /> H. Iaitial Bac�ll: <br /> 1. Afrec pipe is laid p=operly and inspected,place and compact initial <br /> back9ll around pipe to a minimum depth of 6 inches over cop of <br /> pipe. Place initial backfill in lifts of not moce than 8 inches in <br /> compacted�hickness. Bring lifts togethec oo both sides of pipe and <br /> carefully work backfill under pipe liaunches by means of a shovcl, <br /> ��brauon,hand-operated tamping device as appcoved by Engineer. <br /> Take necessary pzecautions ro promct pipc from any damagc or <br /> shifring. <br /> I, Backfilling and Compaction: <br /> 1. Back&ll with Stcuctural Fill. <br /> 2. Place and compact subsequent backfill after inirial backfill is <br /> approved by Engineer. <br /> 3. Backfill to�ades,contours, levcls,and elevations shou�n on <br /> Drawings. <br /> 4. Bacl:fill systcmarically, as early as possible, to allow maximum time <br /> for nacura] settlement Do not backfill o��cr porous,wet, frozcn,or <br /> spongy sub grade surfaces. <br /> 5. Place and compact backfill matecials in cononuous lapers not <br /> excceding 8 inches in compacted chickness. <br /> G. Employ a placement method which does not dismcb oc damage <br /> uuliucs in ucnches. <br /> 7. Condition backfill wirhin plus or minus 2 percent of iu optimum <br /> moistuze content so specified compaction can be attained ceadily. <br /> Ivfaceria] containing excessive moistuce,beyond moisture contenc for <br /> specified densiry as deceimined by laborarory compacuon mscs shall <br /> not be uscd for backfill. <br /> 8. Raise bacl:fill acound structUres evenlv. <br /> 9. Pinish arca ro unifocm conrour ro propccly drain and grade rnurc <br /> scrface to a smooch and ordedy appearing surfaee. <br /> 0'-3�1-x COPITR�►CT RECORD <br /> DOCUMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.