My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1205 CRAFTSMAN WAY PORT INFRASTRUCTURE 2016-01-01 MF Import
>
Address Records
>
CRAFTSMAN WAY
>
1205
>
PORT INFRASTRUCTURE
>
1205 CRAFTSMAN WAY PORT INFRASTRUCTURE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2017 12:53:14 AM
Creation date
2/12/2017 12:52:51 AM
Metadata
Fields
Template:
Address Document
Street Name
CRAFTSMAN WAY
Street Number
1205
Tenant Name
PORT INFRASTRUCTURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit for 210 If 8" Sewer at NMR CraRsman District ., - - <br /> Pwa�07-o 30 <br /> Kirk Brooks <br /> To: Kirk Alm <br /> Cc: Alan Locke; Mark Sadler; Mark Wellman; Gerry Crum <br /> Subject: RE: Permit for 210 If 8" Sewer at NMR Craftsman District <br /> Kirk, <br /> Submit as soon as possible. We will need 4 copies of each of the plan sheets. I will fonvard this on lo our inspector and <br /> water departinent as a heads up. I will need at lease a couple of weeks to get this reviewed and ready. Maybe three. <br /> Kirk <br /> From: Kirk Alm [mailto:Kirk-Alm@Hoffmancorp.com] <br /> Sent:Thursday, June 29, 2006 8:28 AM <br /> To: Kirk Brooks <br /> Ce: Mike See;juliec.ici@verizon.net; Gary Watters <br /> Subjeet: Permit for 210 If 8" Sewer at NMR Craftsman District <br /> Kirk, <br /> As part of the shallow soil voluntary cleanup action at the Port's North Marina Site,we will be instailing a 150'section of 8" <br /> PVC sewer and two manholes at the same time that we are cleaning up area J-3. Area J-3 is an area where it's not <br /> possible to remove all the contaminated soils, so the plan is to mass excavate the area down 4.5'from existing, and then <br /> cut in a trench for the 8" sewer, and then to cap the existing soil with a non-woven geotextile fabric and place the pipe and <br /> backfill the area. <br /> Initially, this seclion oF pipe was included in the Craftsman District Boatyard Development infrastructure drawing package <br /> (currently in for city review), but it made sense lo move up lhe installation of this one section of pipe and have our <br /> contaminated soiis excavation contractor install it while they are on site at this time. <br /> What is the time frame that will be needed for obtaining a permit for this work? I've attached a copy of the drawing C1.1 <br /> and CS1.7 for your review. <br /> The scope of work is: <br /> 1. 210 If S"PVG ,,�wer Line,with 48"manholes on each end. The manholes and the new pipe would not be <br /> connected to any existinc� se�ver system at this time. Final connections to City of Everelt sewer system would be done as <br /> part of the Craftsman District Boaryard Development permit. <br /> 2. Inslall 270 IF temporary above ground 6" HDPE to maintain waler service to 12�" street bulkhead. Existing water line <br /> will be disturbed as part of the Area J-3 contaminated soils removal. <br /> Besides tlic permit application form, Ihe lwo drawings and applicable specifications, is there anything else that you would <br /> need included as part of the permit submittal for this small scope oF work7 I would like to submit this information either <br /> latter today or sometime tomorrow. <br /> Thanks, <br /> Kirk Alm <br /> G/?9/20UG <br />
The URL can be used to link to this page
Your browser does not support the video tag.