Laserfiche WebLink
Permit for 210 If 8" Sewer at NMR CraRsman District ., - - <br /> Pwa�07-o 30 <br /> Kirk Brooks <br /> To: Kirk Alm <br /> Cc: Alan Locke; Mark Sadler; Mark Wellman; Gerry Crum <br /> Subject: RE: Permit for 210 If 8" Sewer at NMR Craftsman District <br /> Kirk, <br /> Submit as soon as possible. We will need 4 copies of each of the plan sheets. I will fonvard this on lo our inspector and <br /> water departinent as a heads up. I will need at lease a couple of weeks to get this reviewed and ready. Maybe three. <br /> Kirk <br /> From: Kirk Alm [mailto:Kirk-Alm@Hoffmancorp.com] <br /> Sent:Thursday, June 29, 2006 8:28 AM <br /> To: Kirk Brooks <br /> Ce: Mike See;juliec.ici@verizon.net; Gary Watters <br /> Subjeet: Permit for 210 If 8" Sewer at NMR Craftsman District <br /> Kirk, <br /> As part of the shallow soil voluntary cleanup action at the Port's North Marina Site,we will be instailing a 150'section of 8" <br /> PVC sewer and two manholes at the same time that we are cleaning up area J-3. Area J-3 is an area where it's not <br /> possible to remove all the contaminated soils, so the plan is to mass excavate the area down 4.5'from existing, and then <br /> cut in a trench for the 8" sewer, and then to cap the existing soil with a non-woven geotextile fabric and place the pipe and <br /> backfill the area. <br /> Initially, this seclion oF pipe was included in the Craftsman District Boatyard Development infrastructure drawing package <br /> (currently in for city review), but it made sense lo move up lhe installation of this one section of pipe and have our <br /> contaminated soiis excavation contractor install it while they are on site at this time. <br /> What is the time frame that will be needed for obtaining a permit for this work? I've attached a copy of the drawing C1.1 <br /> and CS1.7 for your review. <br /> The scope of work is: <br /> 1. 210 If S"PVG ,,�wer Line,with 48"manholes on each end. The manholes and the new pipe would not be <br /> connected to any existinc� se�ver system at this time. Final connections to City of Everelt sewer system would be done as <br /> part of the Craftsman District Boaryard Development permit. <br /> 2. Inslall 270 IF temporary above ground 6" HDPE to maintain waler service to 12�" street bulkhead. Existing water line <br /> will be disturbed as part of the Area J-3 contaminated soils removal. <br /> Besides tlic permit application form, Ihe lwo drawings and applicable specifications, is there anything else that you would <br /> need included as part of the permit submittal for this small scope oF work7 I would like to submit this information either <br /> latter today or sometime tomorrow. <br /> Thanks, <br /> Kirk Alm <br /> G/?9/20UG <br />