My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1205 CRAFTSMAN WAY PORT INFRASTRUCTURE 2016-01-01 MF Import
>
Address Records
>
CRAFTSMAN WAY
>
1205
>
PORT INFRASTRUCTURE
>
1205 CRAFTSMAN WAY PORT INFRASTRUCTURE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2017 12:53:14 AM
Creation date
2/12/2017 12:52:51 AM
Metadata
Fields
Template:
Address Document
Street Name
CRAFTSMAN WAY
Street Number
1205
Tenant Name
PORT INFRASTRUCTURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . . , <br /> , Pwo b�7-o3U <br /> Kirk Alm <br /> From: Kirk Alm <br /> Sent: Thursday,June 29, 2006 8:28 AM <br /> To: Kirk Brooks(kbrooks@ci.everett.wa.us) <br /> Cc: Mike See;juliec.ici@verizon.net; Gary W atters <br /> Subject: Permit for 210 If 8" Sewer at NMR Craftsman District <br /> Attachments: CS1-7.pdf; C1-1.pdf <br /> Kirk, <br /> As parl of the shallow soii voluntary cleanup action at the Port's North Marina Site,we will be installing a 150' section of 8" <br /> PVC sewer and two manholes at the same time that we are cleaning up area J-3. Area J-3 is an area where ifs not <br /> possible to remove all the contaminated soils, so the plan is to mass excavate the area down 4.5'from existing, and then <br /> cut in a trench for the 8"sewer, and then to cap the existing soil with a non-woven geotextile fabric and place the pipe and <br /> backfill the area. <br /> Initially,this section of pipe was included in the Craitsman District Boatyard Development infrastructure drawing package <br /> (currently in for city review), but it made sense to move up the installation of this one section of pipe and have our <br /> contaminated soils excavation contractor install it while they are on site at this time. <br /> What is the time frame that will be needed for obtaining a permit for this work? I've attached a copy of the drawing C1.1 <br /> and CS1.7 tor your review. <br /> The scope of work is: <br /> 1. 210 If B" PVC Sewer Line,with 48" manholes on each end. The manholes and the new pipe would not be <br /> connected to any existing sewer system at this tirne. Final connections lo City ot Everett sewer system would be <br /> done as part of the Craftsman District Boatyard Development permit. <br /> 2. Install 270 If temporary above ground 6" HDPE to maintain water service l0 12m street bulkhead. Existing water <br /> line will be disturbed as part of the Area J-3 contaminated soiis removal. <br /> Besides the permit applicalion form,lhe two drawings and applicable specifications, is there anylhing else that you would <br /> need included as part of the permit submittal for lliis small scope of work? I would like to submit lhis information either <br /> latter today or sometime lomorrow. <br /> Thanks, <br /> Kirk Alm <br /> 425-303-9398 <br /> � � <br /> CS1-7.pdf(147 KB) CI-l.pdf(140 KB) <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.