Laserfiche WebLink
3. No construclion debris or materials may be placed within the public right-of-way. <br /> 4. The Applican;s shall use caution at the consiruction area of ihe new deck. <br /> Specific aiteniion sha:l be addressed to utiliiies of water and sewer that exist in <br /> ihe area. <br /> 5. All grading and fill on-site shall be done in a manner that does not impact <br /> surrounding properties. <br /> 6. Approval of construction plans by the Ciry will require a demonstration that all !, <br /> perlinent standards and regulalions of the Cily are satisfied. � <br /> I <br /> 7. Ciry streets are lo be kept clear of dirt and debris at all times during construciion. j <br /> Dust suppression and street cleaning must occur as directed by the Public Works i <br /> Inspector. <br /> S. Lack of comment on the plans submitted with lhe applicaiion does nct constitute <br /> approval of these plans. <br /> 9. AI� exposed ground must be reseeded within 30 days of the completion of <br /> construction. If reseeding is not practical due to weather or seasonal problems, <br /> the ground must be covered with mulch as direcled by lhe City Engineer. <br /> Done and dated this 22nd day of June, 2011. <br /> �� � ��i��,,�.. <br /> �am� � . Driscoll <br /> He�r(ng Examiner <br /> 7 <br />