Laserfiche WebLink
. 2. LAND USE AND ZONING REQUIREMENTS (City of Everett) The <br /> commentor requested that rhe proposa! comply with the city Zoning Code and <br /> General PJan. <br /> � The proposed acdon will be constructed in accordance with all applicable legal <br /> requirements for land use and zoning in accordance with the Washington Growth <br /> Management Act of 1990 and the Growth Strategies Act of 1991. <br /> 3. DEDICATED PARKING STALI.S (City of Everett, William .'.nderson, Dennis <br /> McLaughlin) The commenrors requested that specrfrc parking sn.11s be dedicated <br /> and si;ned for sole bingo hall ure during days of operatron. <br /> As stated in the EA, approximately 200 stalls will be dedicated for bingo hall use. <br /> The stalls will be located around the perimeter of the building and be clearly <br /> muked. Enforcement will be the responsibility of the operator of the bingo hall. <br /> 4. STORM WATER RUNOFF QUALITY AND QUAIVTITY (City of Everett) <br /> The commentor rgquested that sto�m water qualiry and quantiry be required per ciry <br /> ordinance. <br /> • Water runoff quality and quantiry features will be include3 and designed to the <br /> stricter of either the city of Everett standazds or the Puget Sound Storm Water <br /> Management Manual. <br /> 5. NATIONAL POLLUTANT DISCFIARGE ELIlVIINATION SYSTEM PERNIIT <br /> (�IPDES) (City of Everett) The commentor stated that, if an NPDES pemiit is <br /> required, Deparrment of Ecology approval would be nquired prior to ciry review <br /> of site pinns. <br /> An NPDFS permit issued by the Department of F,cology (DOE) may be required <br /> for this proposal. Appmpriate temporary and permanent water qualiry control <br /> plans will be prepared for approvai by DOE and will be submitted with any other <br /> required permit applicadons. <br /> 6. APPROVAL OF PLANS (City of Everett) The commenror requested design of <br /> the proposal to ciry standardr and approva!authoriry on al!plans. <br /> The engineering design of the site will be in accordance with WSDOT, Metro and <br /> Communiry Transit and applicable City of Everett Design Standards. Non- <br /> engineering aspects of the sitc, such as set backs and landscaping, will be in <br /> accordance with city zaning and land use requirements. <br /> 7. PEDESTRIAN SAFETY/ SIDEWALKS (City of Everett, Everett School <br /> District, Regina Botdey) Concern over safery of pedestrians, particularly school <br /> children, due to increased tra�c war exprcrsed by these commentors. <br /> Use of the existing access points to the site avoide� creating any new conflict <br /> points. Any additional tnffic generated by the proQosal would be concentrated on <br /> State Routes and El Capitan Way betwcen the wes�access and SR 527 where there � <br /> 3 <br />