Laserfiche WebLink
Le[ter to W• Johnson <br /> July 1, 1992 <br /> Page.6 <br /> determined for current conditions. Under developed conditions, a similar rate <br /> and quantity of roof drainage or treated runoff must continue to be <br /> discharged to the wetland. Prior to the applicatian for building permits and <br /> plan review by the Fublic Works Department, a characterization of the <br /> hydrology of the wetland(s) on ar adjacent to this project that may be <br /> afiected by the development of this site must be submitted to and approved <br /> ❑ by the Planning Department Isite A'1 and site #31. <br /> 1 <br /> g. If any storm water discharges to wetlands are proposed or are necessary to <br /> protect normal wetland hydrology, point source discharges should be <br /> avoided. Techniques that result in dispersed discharge shouid be explored, <br /> such as dispersion trenches or buried perforated pipe located at wetland <br /> butter edges Isite #1 and site �91. <br /> g. A NPDES (Na[ional Pollutant Discharge Elimination Systeml permic may be <br /> required for this site. If a permit is required, written comments must be <br /> a received fram the Depanment of Ecology, prior to City of Everett review of <br /> the construction plans, indicating that the proposal meets with DOE's <br /> approval or indicating any requirements to be met by the applicant (site 1t1 <br /> and site t131. <br /> 10. An easement for the existing City of Everett water ovided that an adequate <br /> north end of site �3 must ba granted to the City p <br /> easement does not already exist. <br /> 11 . Any necessary lowering or other reconfiguration of the City's water main on <br /> si[e #3 shall be done to City standards and at the expense of the proponent. <br /> 12. Detailed drawings in accordance with City Design and Construction <br /> StandardS shall he submitted to the Public Works Depai. �ent, showing site <br /> parking tayout, landscaping, utiiities, stor-n drainage, and temporary <br /> construction erosion control, and all required improvements in the public <br /> � right-of-way. Public Works Department approval of these drawings is <br /> required prior to any permits being issued. All improvements shall be <br /> completed, approved, and warranted before the occupancy permic is issued <br /> lsite #1 and site #31. <br /> 13. Continuous street improvements, including curb, gutter, and sidewalk, must <br /> be provided along the south side of EI Capitan Way, the west side of <br /> ❑j Merchant Way, the west side of Meadow Way and the notth side of Burley <br /> Drive as shown on the attached map. Handicap ramps must be provided at <br /> all incersections (site t111. . <br />