Laserfiche WebLink
. <br /> 1 and your questions. <br /> 2 So with that, Ron. <br /> 3 Mr. Kinoshita: Good eveninq. The <br /> 4 Washington State Department of Transportation policy <br /> 5 is to � ncourage people to do ride sharing in the State <br /> 6 of Washington. This is by using tha HOC ?anes and the <br /> 7 Park and Ride lots. Now, this will help the Z-5 <br /> 8 corridor if we ride share and keep the traffic volume <br /> 9 down to a minimum. <br /> 10 Now, this project, as Bob Aye menti�ned, was <br /> il developed as part of the joint agreement between <br /> 12 community Transit and Washingxon State Department of <br /> 13 Transportation to maintain, operate, and construct, a <br /> 14 Park and Ride lot in the Community Transit service <br /> 15 area. The prospective of this project was to maintain <br /> 16 a Park and Ride lot with approximately 600 to 800 <br /> 17 stalls and also be within a one-mile radius of the <br /> 18 interchange among the I-5 corridor. <br /> 19 There are eight sites selected for this <br /> 20 particular area. Tonight we are discussing two of <br /> 21 them, and the final selection toniqht, with your <br /> 22 comments, will be decided by the board of directors of <br /> 27 Community Transit and the City of Everett, City <br /> 24 Counsel, and the Washington Stata Department of <br /> 25 Transportation. <br /> 4 <br /> CENTRAL COURT REPORTING <br /> (206) 747-3016 <br />