Laserfiche WebLink
, <br /> 1 The right of way will be a part of our <br /> 2 Washington State Department of Transportation and <br /> 3 Community Transit will maintain and operate this <br /> 4 particular site. Schedulewise, the construction uill <br /> 5 be done in 1984 . The eiqht sites, looking at the <br /> 6 aerial phoLo here, we have I-5 qoing northbound. We <br /> 7 have eastbound interchanqe. We have Scenic Drive and <br /> 8 75th Street going this way. Here is Beverly Park. <br /> 9 And this is Site 2 �of one of the alternatives. <br /> 10 Site 2 wasn't selected because of the wetland issues <br /> 11 and also because of the transmission line, Bonneville <br /> 12 Power lines and also Puqet Power lines that run into <br /> 11 this area right here. And also this area is the <br /> 14 proposed sita for the animal shelter relocacion, <br /> 15 that's Everett animal shelter. <br /> 16 This is Snohomish river. This is Burlinqton <br /> 17 Northern. This is I-5 goinq northbound. Eastbound at <br /> 18 the interchange is about half a mile or a mile down <br /> 19 south. This area is Alternate 4, Site 4, Site 5, Site <br /> 20 6, and Site No. 7 . These sites were not selected <br /> i <br /> 21 because of a lack of good freeway access to I-5 . Also <br /> 22 th.- _ are hazardous wastes in this particular area <br /> 23 because this site was the old qarbage dump and also <br /> 24 the old tire fire in this particular area. <br /> ZS Site No. 8 is right next to Burlington Northern <br /> 5 <br /> CENTRAL COURT REPORTING <br /> (206) 747-3016 <br /> � <br /> I <br /> � <br /> � <br />