My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1700 ENGLAND AVE 2016-01-01 MF Import
>
Address Records
>
ENGLAND AVE
>
1700
>
1700 ENGLAND AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2017 8:33:54 AM
Creation date
2/12/2017 8:33:39 AM
Metadata
Fields
Template:
Address Document
Street Name
ENGLAND AVE
Street Number
1700
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Z�rnng Properlp 9J-/2-10 <br /> Ercrell, IVnshiuglnn <br /> could occur. Base soil below the rockery should be continned as suitable for <br /> bearing support by a representative of the geotechnical engineer prior to the <br /> placement of any drainage rock or rockery. Bearing soil should be confirmed as <br /> � suitable for support of a maximum bearing value of 1500 ps£ The native sands <br /> " encountered below the topsoil and fill at this site should meet the requirement for <br /> support of the proposed rockery. If a two tiered rockery is used, the base bearing <br /> soil of the upper wall should be verified by a representative of the geotechnical <br /> engineer. <br /> The long term stability of the proposed rockery will in part be determined by the <br /> adequacy of the drainage on this site. GES recommends the following drainage <br /> controls: <br /> � A n�inimum twelve (12) to eighteen (18) inches of 4" to 6" crushed rock <br /> should be placed behind the rockery wall for drainage. If the fill or <br /> e�posed soil contains over 5% fines passing the #200 sieve - based on <br /> field observation of the soil, then we recommend that a high strength, <br /> , puncture resistant filter fabric be placed between the drainage rock and tlie <br /> embanlonent soil to prohibit the migration of fines into the drainage rock. <br /> The need for the filter fabric behind the wall sliould be determined by a <br /> representative of the geotechnical engineer at the time of conshuction. <br /> * A minimum four (4) inch perforated P.V.C. drain line should be placed <br /> along the Uase of embedment of each rockery wall, along tlie full length of <br /> die rockery. The line should be placed in a shallow ditch, approximately <br /> 12" deep, dug along the back side of the keyway excavation. The line <br /> should be laid in the base of the ditch, in such a manner as to providc <br /> positive drainage of collected water through the line towards an <br /> appropriate point of discharge away from the base of the rockery wall. <br /> The drain line should be bac�lled with a minimum 18" of washed �/S" <br /> 19 GES, Lic. <br />
The URL can be used to link to this page
Your browser does not support the video tag.