Laserfiche WebLink
� �`��. i <br /> � i i <br /> � <br /> . , , .,...<,...�<-. <br /> .�„�-.-,...-.o.�-•�.�'r-�--• <br /> ,--� <br /> Dccembcr 1 S, 2010 <br /> To: Mukilteo 1'Vater� Sewer Department <br /> City of Everett Water& Sewer Depanment <br /> RG: P.osewood�states(8 Ne�v Homes) <br /> Paine Pield Way(5 New Homes) <br /> Nabil Messak (2 New Water Meters for a Duplex) <br /> Rosewood Estates— In Junc of 2010, I began putting together an 8 lot new home project on <br /> Rosewood Avenue cailed Rosewood Estates. I have represented 5 local builders as their real <br /> cstate agents for the previous 12 years. With the wrn in the real estate market 3 years ago«�e <br /> have been forced to get creative to survive this downwm. The project of Rosewood Estates <br /> invoh�cd finding a local banl:�vith vacant lots they�vere holding in their REO department, <br /> finding an im�estor(in this case) Far East Holdings and hiring one of my builders (in this case <br /> Blue Ridge Construction) to be the gencral contractor for the home. <br /> [ am rcquired to put togethcr an actual bid/budget for the investoc The budget is very specific. It <br /> invoh�es gathering 67 difCerent bids from all suppliers and contractors for all phases tluoughout <br /> construction. At that point contracts are dra�tim up by attorneys and monies aze transferred into a <br /> working account for the project. I'viowing that wlter and sewer in this area of Everett was <br /> handled by the Mukilteo Water R Sewer Department, I made a trip to verifj�current connection <br /> fees for water and se�aer on diis project. I was infornied that since I would not need �vater& <br /> se���er until afier August 151, I �vould nced to work�vith the City of Everett as the services were <br /> being tumed over to titem. 1 was also given the original as-builts for the water and sewer in this <br /> project as wcll �s copics of the maintenance bonds. I then proceeded to the Ciry of Everett to get <br /> their current water& sewer connection fees, as instructed by Mukilteo. The City of Everett gave <br /> mc all the fees, I pu[the contracts together based on those numbers,the attomeys drew up the <br /> agreements and ���e started the project. While in for pennits we received an email from the City <br /> of L'verett stating that there was a problem betwecn die 2 utility municipalities and we could get <br /> our pemiits to gct startcd but no water and se���er connections until the issue was resolved. We <br /> are in nced of water and sewer connections for the first 2 units. It does not matter to any of the <br /> thrce p�rtics invol��ed who wc pay for���ater and sewer conncctions. \Vhat does matter is the <br /> amount(see bclo���). <br /> � John L. Scott—Everctt�Builder Services A��� <br /> """' 10820 G��ergreen �'Vay • �vcrett • WA • 98204 ' ' ' <br /> Dircct: (425) 239-9924 • O�ce Pax: (425) 513-1200 <br />