My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9016 CORBIN DR A 2016-01-01 MF Import
>
Address Records
>
CORBIN DR
>
9016
>
9016 CORBIN DR A 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2017 6:27:46 PM
Creation date
2/12/2017 6:27:32 PM
Metadata
Fields
Template:
Address Document
Street Name
CORBIN DR
Street Number
9016
Unit
A
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Service Citv of Everett City of Mukilteo Difference <br /> Water ]" Meter $500.00 $5,877.00 <br /> Svstem Develo�ment $1 442.00 $0.00 <br /> Total Water Fees S1,942.00 $5,877.00 53,935.00 <br /> Sewer Connection $70.00 $4,035.00 <br /> Availability $0.00 $1,020.00 <br /> Svstem Development $2 245.00 $0.00 <br /> 'fi�tal Sewcr Fees �2,315.00 55,155.00 52,840.00 <br /> As Shown above,the connection fees in the Mukilteo jurisdiction are considerably higher <br /> ($6,775.00 per home). The investor and investor's attorney refuse to pay the higher fee. The <br /> builder is being paid a flat fee of$10,000 per house to build so he has no ability or obligation to <br /> cover the difference. The shortfall �vould be my responsibility and I don't have the ability to <br /> cover it. I was instructed and informed by both jurisdictions that we would be paying the City of <br /> Everett for connections and working with them. I feel that the fair and right solution would be for <br /> the jurisdiction that will ultimately be collecting the connection fees to honor the instructions <br /> given and charge the City of Everett's rates that were quoted. <br /> Paine Field VVa��—This project is in a similar predicament. The bank is financing the <br /> construction as a way to eliminate vacant lot inventory by alloN�ing single build-outs. The bank <br /> required LXACT construction costs. Win Lessley with Adair Entetprises, LLC was instructed by <br /> Mukilteo Water& Sewer that he needed to work with Everett as they would be acquiring the <br /> �vater and sewer sen�ice August I, 2010. The bank refuses to pay uny overages on line items and <br /> Adair does not have the fi:iancial ability to cover the difference. The City of Everett not only <br /> issued pemiits October 13, 2010 based on this information but also collected the connection fees <br /> of both �vater and sewer(see uttached permits). Construction has now come to a halt as we need <br /> water to test plumbing. Interest charges continue to accumulate as the project sits idle. The City <br /> of�verett refuses to connect�vater and sewer even though they have already been paid for it due <br /> to this mix up. Up to this point the City of Everett has performed all inspections. <br /> Dunles on Corbin — t�9r. Messak (owner) also informed of the change coming and held off <br /> purchasing 2 �vater meters until August l, 2010. Mr. Messak still has no water and a completed <br /> investmcnt property sitting vacant. <br /> This issuc only affects the 3 above named groups. It is a very isolated issue. I would propose two <br /> simple alternatives solutions to this problem on these�,rojects only: <br /> I. If water is transferced to the Cit of Lverett January 1, 201 l, then <br /> a. 11�e will hold off on paying water until the first of the yeu and deal ���ith Everett <br /> b. Mukilteo will charge a total fce of�?3]5.00 for sc���er connection (Gverett's <br /> quoted fcc) <br /> Or... <br /> � .Tohn L. Scott �Everett—Builder Services u� <br /> ""'"'" 10820 Evergreen Way • �verett • WA • 98204 ' � <br /> ;'; <br /> Direct: (425) 239-9924 • Office Fax: (425) 513-1200 '�. ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.