My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2802 EVERETT AVE 2016-01-01 MF Import
>
Address Records
>
EVERETT AVE
>
2802
>
2802 EVERETT AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2017 6:43:16 AM
Creation date
2/13/2017 6:43:03 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERETT AVE
Street Number
2802
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> --"'�" ..' �'�. .....a-a.�+v��.� n��u i�ioi vr WVIt!\ '1'V CG Yilll <br /> � . Page 2 of 5 <br /> ' Address : 2(�02 ^verett Ave. , <br /> 1. Roof Remove the rear (south) brick chimney down to � <br /> the ground. Patch the floor with wood subflooring to <br /> match existing floor thickness and prepare for vinyl. <br /> Repair the ceiling opening with sheetrock , taped and <br /> spackled to match. Wall repair is included in drywall <br /> item. <br /> Strip the entire house toof areas (including porches and � <br /> bay windows) down to the spaced sheathing and cover with <br /> 1/2" CDX plywood and fiberglass shingles (20 year <br /> warranty to be registered with the roofing manufacturer <br /> by the contractor) . Replace all rotted roof soffit <br /> boards (including pocches and window overhanqs) and <br /> . rafter tails with similar materials. Step flash roof <br /> where it butts into back wall of upper house. Replace <br /> all flashed roof penetrations (including front chimney) <br /> and jacks as necessary to last at least the expected <br /> life of the new roof covering. Cut in screened <br /> ventilation openings to l�wer attic space to rode. <br /> Owner to select the new roofing color. <br /> All new roof work shall be performed in compliance with <br /> the Uniform Building Cude, 1982 edition, and in <br /> accordance with the roofing manufacturer 's installation <br /> specifications. <br /> $ 3 � ']� <br /> 2. Gutters 6 Window Repair Gutters. Remove gutters and <br /> install continuous 5" R style aluminum gutters to a11 <br /> house main roof - areas (not porches) with aluminum <br /> downspouts and concrete splashblocks directing water <br /> away from the house. Owner to select color of new <br /> gutters. Replace rotted fascia boacds prioc to 'gutter <br /> installation. • <br /> Window repair. Replace all cracked and broken window <br /> panes around the entire house. Check all other window <br /> panes for looseness and missing glazing putty. install <br /> points and putty as necessary to secure all window panes . <br /> New window. Remove bathroom window and install new 16" <br /> wide insulated aluminum opening window or replacement <br /> unit into opening keeping to the west side as far as <br /> possible giving room for new tub-shower installation. <br /> Fill in remaining window opening to match and complete � <br /> with wood trim ready to paint. Seal arounc] window with <br /> high quality caulking. <br /> $ g� � <br /> 3. Porch & StairwaY Repair Install a heavy-duty <br /> custom-built black wrought iron railing on one side of <br /> front concrete stairway £ull length top to bottom. Bolt <br /> secure to existing concrete. Remove grass from steps. <br /> Replace the front porch steps (treads and risers) and �; <br /> . add the same type heavy duty railings on Pach side of <br /> steps bolting securely to concrete landing and porch <br /> floor . <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.