Laserfiche WebLink
� <br /> " - - '-- --"'---•.-� ...•-� ..+.+� va nVAt� 1V DL D1L <br /> � Pa9e 3 of 5 <br /> � • Address : 2802 E�erett Ave. , <br /> � <br /> Back porch. Remove the concrete steps and install new <br /> 3 ' 0" wide wood steps with risers down to concrete <br /> sidewalk. <br /> All new stair and railing work shall be performed in <br /> compliance with the requirements of the Uniform Building "r <br /> Code, 1982 edition. <br /> $ ��� <br /> 4. �Plumbing Replace the house galvanized water lines <br /> w ti h type "M" copper lines sized to code. Add shut offs <br /> at plumbing fixtures where necessary. <br /> Ritchen. Remove sink and plumb in a new stainless steel <br /> double bowl sink complete with faucet and sprayer . <br /> Bathroom. Move existing waste cleanout down to crawl <br /> space and remove tub. Plumb in complete a new 5' 0" <br /> white steel recessed batht'ub with faucet, shower <br /> diverter. valve, arm and head. install new safety glass <br /> sliding doors (opague) and cecessed chrome soap dish in <br /> tub east wall. New walls and tub surround is added in <br /> another item. Install wall framing and secure a new 30" <br /> long chrome grab bar on tub east wall. Place in • <br /> convenient location for ow�er. <br /> All new plumbing fixtures shall be "A" grade and <br /> competitive styltng. All new faucets shall be <br /> washerless and single lever , Delta or equal. All new <br /> plumbing shall meet the requirements of the Uniform <br /> Plumbing Code, 1982 edition. <br /> $ � s� 6 y <br /> 5. Framing 8 Drywall Repair Bathroom. Repair the <br /> rotted flooring, framing and foundation under the <br /> bathroor� area as necessary to restore back to code. <br /> Remove dirt from crawl space in the area of the bathroom <br /> to provide 18" clearance under floor joists and replace <br /> all broken cement asbestos board in this area. Frame in <br /> 2" x 4" wall on 16" centers at northend of tub to <br /> complete surround. Cover the new framing and walls <br /> around tub with water resistant 1/2" gypsum wallboard <br /> tape and spackle smooth ready for paint. Repair wall <br /> behind the toilet and smooth out to match surrounding <br /> wall surfaces. <br /> Pantry, Cut out the attic access hole to code minimum <br /> dimensions and remove shelving. Fasten 1/2" gypsum <br /> wallboard to the entire room ceiling and walls complete, <br /> tape ,snd spackle smooth. Reinstall shelving after <br /> painting room. <br /> Ritcheil. Cover the entire kitchen north wa?.1, following ,� <br /> . chimney removal, with 1/2" gypsum wallboard, tape and <br /> spackl�e smooth to match other kitchen wall surfaces.. <br /> J <br />