Laserfiche WebLink
� <br /> . "'_" _'—__' _•••_-•••••• r..... .,i.�a vr rvvtct� tV cL .nlU <br /> , � Page q of 5 <br /> ' Address : Z802 Everett Ave. , • <br /> r Second floor stairway. Close off top of stairway with . <br /> 2" x 4" framing on 16" centers and 2 ' 6" wide standard <br /> prefinished prehung hollow core mahogany door complete <br /> with polished brass passage set. Door to seal off <br /> keeping the warm air downstairs. Sheettock � both sides <br /> of framing (�m000th finish) and trim out door cbmplete. • � <br /> Hack door. Repair door and dead latch, making secure at <br /> hinges and latch solid. Door and locks to operate <br /> properly. <br /> All new work to be performed in compliance with the <br /> requirements of the Uniform Building Code, 1982 edition. <br /> $ 1 � �� <br /> 6. Electrical Install new 200 amp service and panel <br /> complete, GE or equal, with breakers. <br /> Wire in and install two new recessed fan-forced wall <br /> heaters, one in the bathroom and the other in the <br /> kitchen, with heater mounted thermostats. New heaters <br /> shall be capable of maintaining a room temperature of <br /> 70° F at a point three feet above the floor. Add <br /> ceiling fan, vented directly to the exterior , to the <br /> bathroom and place on separate wall switch. <br /> Run new circuits and receptacles complete to the kitchen <br /> range and clothes washer as necessary to meet code. <br /> Turn washer to face west on east bathroom wall. <br /> Add three new duplex receptacles and wiring complete : <br /> small appliance receptacles, one on each side of' kitchen <br /> sink, and a GFI receptacle next to the bathroom sink. <br /> All new electrical work shall meet the requicements of <br /> the National Electrical Code, 1981 edition. <br /> s la'Zo2 � <br /> 7. Insulation Install R-30 insulation over the entire <br /> kitchen, bathroom and pantry areas . See item �1 for <br /> ventilation.. Wrap water lines with foam type insulation <br /> and install R-19 insulation between the floor joists in <br /> crawl under the entire heated areas of house using rods <br /> or lath, no staples. Add screened ventilation to crawl <br /> meeting code. Cover the entire crawl ground area with 6 <br /> mil plastic lapping joints 12" . <br /> $ � / � <br /> 8 . Laminate Work and Flooring Laminate work . Remove <br /> kitchen cabinet counters and install new top. Cover top <br /> with laminate formica or equal , and backsplash on <br /> adjoining walls up to bottom of window sill . Add the <br /> same type laminate over bathtub walls up at least 70 - <br /> inches above the tub drain and finish off with <br /> appropriate moldings and seal with silicone rubber <br /> caulking. Owner to select laminate colors. <br /> .� <br /> � <br />