My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1000 SE EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1000
>
BASE FILE
>
1000 SE EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2019 8:19:18 AM
Creation date
2/13/2017 6:55:29 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1000
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Check 172a- <br /> Larry Callahan <br /> August 9, 1985 <br /> Page Two <br /> the exterioi_4�alls, is at least 2000 sf greater than that. Therefore, the <br /> floor area within the extei•ior aialls is at least 74,000 sf. The allowable <br /> floor area of the buiding is exceeded. <br /> 3. The actual floor area increases even beyond that. The building entryway <br /> areas �ahich have canopies overhead should be included in the calcul tion for <br /> floor arez. Section 407, definition of floor area ��� <br /> DG %t�a((Ge G�a.��� - <br /> STRUCTURAL COMPIENTS �vtia.�v�'OR..� 1L��''YL°'t <br /> �1 <br /> 1. Quality control : '- <br /> a. Special inspection on this project should be provided for pTacement <br /> of concrete (see comment 6-d), field welding, ductile moment-resisting <br /> space frames (see comment 5-a), high-strength bolting (see comment <br /> 10-i ) , and placement of structural fill (see comnents 2-c,d) . Section <br /> 306(a) <br /> b_ Special inspectors should be employed by the owner and should be cer- <br /> tified inspectors you approve. Section 305(c). They should perform <br /> continuous inspections during their phase of the work, not just peri- <br /> odic inspections. Section 306(c) <br /> c. Welders should be certified by third party quality control agencies, <br /> such as those licenced by WABO. Section 2714 &UBC Standard 27-6 <br /> d. Fabrication of the "Hambro" steel joists (see comment 6-a) should be <br /> done under quality control procedures inspected by Underwriters Lab- <br /> oratory--Evaluation Report AA523. <br /> e. Structural steel fabrication should be performed in a shop you approve. <br /> 5ection 306(f). See also comment 7(c). <br /> 2. Soils report and earthwork: <br /> a. The soils report for the project, prepared by Rittenhouse-"Leman <br /> & Associates �1J-4545, dated April 15, 1985, complies with the minimum <br /> requirements of Section 2905. Th� key recommendations of the report <br /> suci� as those discussed below shouid be shown on the plans and speci- <br /> fications, rather than a general note rcferring to the report. Section <br /> 302(c). Soils testing prior to constructiu�� mav be appropriate--see <br /> comments 2(g,h). <br /> b. Has a site grading plan been submitted for the project? The relation- <br /> ship between finish floor elevation and existing grades significantly <br /> affectsproper implementation of the soils report recommendations, as well <br /> as Che structural design. <br /> � . <br />
The URL can be used to link to this page
Your browser does not support the video tag.