Laserfiche WebLink
Plan Check ll2.7- <br /> Larry Callahan <br /> Au9ust 9, 1985 <br /> Page Five <br /> h. Column struts between frame coluinns ai�e provided for all frames <br /> except "frame 7". They should be provided for that frame as well . <br /> 5. Ductile moment resisting space frames: <br /> a. Welded connections betwe�n primary members of the ductile moment-resist- <br /> ing space frames should be tested by nondestructive methods for com- <br /> pliance with UBC Standard 27-6. The test program should be established <br /> by the engineer-of-record and shown on the plans and specifications. <br /> The program should include the minimum requirements in Section 2722(f). <br /> The requirements should be shown on the plans and specifications. <br /> b. In order to qualify as a moment resisting space frame unde�• the defini- <br /> tion of Section 2312(b), all columns should have a joist, bezm or <br /> girder framing into them in two perpendicular directions at each floor. <br /> IJhere joists line up with columns, their connectiun to the column <br /> should be detailed to insure that nominal moment resistance is achieved <br /> at all joints. Where joists do not line up with columns, such as grid <br /> D-7 on Sheet 5-4, a member siiould be added. <br /> c. The connection between beams & columns in the ductile frames(Detail 4/S-7) <br /> should develop the full plastic moment capacit,y of the beams. Section <br /> 2722(d). This cannot be achieved by welding only the beam flanges <br /> to the columns. In lieu of this , calculations must demonstrate that <br /> adequate ductile joint displacement capacity can be developed with a <br /> lesser connection. Section 2722(d), exception <br /> d. The shears in many of the panel joints of the ductile frames, and in <br /> many of the doubler plates where they are provided, exceed the allow- <br /> able shear in equation 21-5 of Section 2721. <br /> e. The conneciions between the duct�le columns and roof girders should be <br /> detailed. Section 302(c). The typical fioor 9irder-to-column details <br /> do not apply at the roof. <br /> 6. hl�mbro composite floor system: <br /> a. "Hambro" �omposite steel joist and concrete deck floor systems are <br /> proposed for the building. See Evaluation Report PFC-2869. You <br /> could if you wish, accept this systzm under Section 105. <br /> b. If the systems are proposed to achieve a fire resistive floor/ceilin9 <br /> assembly, the project specifications should clearly outline the method <br /> of installation, to verify coinpliance with said report. Note that <br /> ceiling runners are required in 2 perpendicular directions for the <br /> proposed joist spacings. <br />