My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1010 SE EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1010
>
BASE FILE
>
1010 SE EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 11:30:09 AM
Creation date
2/13/2017 7:00:31 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1010
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. - ....... _� � � � . . ....� <br /> Yt..']�_ ��:C' <br /> , . i_.::n rcr�^rt��� , ,,_r ,_ . _ . . _ .. ..�.:..1:. _c�c �!� t;cc _. _ _tcntic,^, <br /> and dreinaae for theiL _�,:n tcso�_cci���e size. <br /> 5. The sanitary sewer will be jeintlp developed and used from 100�h <br /> Street, alon, the easteily property boundary line on th� Office <br /> ParY, property, northerly to and includina the fiest r.anhole, �nd <br /> any related requicements, oc�r Grading titility Plan approved b: t_._ <br /> City. All costs wi11 be shaced fifty-fifty (50/50) for this <br /> development and use, but retail developer's share of these cosc� <br /> shall not exceed $8,700.00, includin9 contcactors overhead and <br /> Fashington State S�les Tax. This pcovision is conditioned on the <br /> Convenience Center Owners making provision for at least one-halt <br /> (}:) of the gradz transition on their site between the properties at <br /> the southerly east-west cross access location betoreen the properties. <br /> Office Park developer shall be required to perform this work and will <br /> pcoceed with said work as soon as possible and agrees to complete <br /> said construction no later than Decembec 31, 1980. <br /> 6. Street and parking lot lighting will be situated on the above <br /> desciibed m�dian st[ip, its install�tion and maintenance to be <br /> shared fifty-fifty (50/50) by the Parties. One-half (�) of such <br /> street lights will be wired and metered into each of the respectivc <br /> two projects. They will all be activated by photo electric eyes. <br /> In any event, retail developer's shace shall not exceed 56,753.00 <br /> and Office Park Developer shall proceed with th� work. <br /> 7. n Grading Plan is attached hereto, marked Exhibit A, showin9 the <br /> mutual ingress/egress, the median landscape buffei, and the <br /> appropriate cross access points between the pcoperties. A Lightin9 <br /> Plan is attached hereto, marked Exhibit II, showing the placemznt <br /> and specification of Yhe li9hting to be placed on the median st:ip. <br /> Exhibits A and B will control and further define the intent of thc <br /> narties. The implementation of this Agreement shall be gover�ed by <br /> � said attached Exhibits. <br /> 8, The Parties hereto agree to execute, without dclap, all. necessary <br /> legal instruments includi�g but not limited to, thc scwcr ti�so,�.•-:nt <br /> and Access Easenents. <br /> 9. It is agreed by the Paeties that the Office Par1: D��velopers may <br /> proceed with the actual development of sanitary seiaer and the <br /> five (5) foot median strip on each pLopercy, and the stieet lini�t <br /> plan. The cost foc such work shall be reimbursed by Com�enienc� <br /> Center Owner iorthwith upon billing. <br /> 10, i:>:penses for Ed Hznsen's legal services related to these specific <br /> items herein shall be shared fifty-fifty (50/50) by the Partie�. <br /> Upon execution o£ this lettei, we taill instruct Ed Hansen to prep:�rc <br /> ihr- nec^ss=rp lcg�l docurr.ents to i.:-.r�r_-;;��nt tnis , �_recment.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.