My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1019 SE EVERETT MALL WAY 2016-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1019
>
1019 SE EVERETT MALL WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2017 7:05:14 AM
Creation date
2/13/2017 7:05:02 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1019
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ , <br /> �} <br /> � �--� , ; _ : . <br /> � '.Bob Landles, Planning Department �� ��•:� � ;V,' ;= � � '; �• , <br /> ' UH � 3��� :,�.a�� -� . <br /> FAo�. Puhlic Works Department ('� �,�,.- _ � <br /> J 1 1 <br /> pATE March 18, 1980 �y�*}- � . ,: . . _ - <br /> t.�l..... F� : r :�L.,"�: <br /> sue�ecr $.�.P.A. Checklist Review 1/195 GITYCiEVERETT,EYEi�'i(�M'�MINCTON <br /> .,.,,[. <br /> Pl�nning File 1/80-13 <br /> i <br /> PROPOSAL: ( <br /> To construct two story, 14,500 square foot office building north of South � <br /> Bruadway, across from Everett Mall. - <br /> RECOMMENDATIONS: � <br /> It is the recommendation of the Public Works Department that issuance <br /> of a Negative Declaration be subjec2 to the following: <br /> 1. A detailed drawing shall be submitted to the PublicWorks Department <br /> � showing parking layout, landscaping, driveways, utilities, storm drainage, <br /> and all required improvements to the public right-of-way. Al! public <br /> right-of-way outside of a line 50 feet north of the centerline is required <br /> to be landscaped. Public Norks Department approval of these drawings <br /> is required before any permits are issued. All improvements shall be <br /> completed before the Occupancy Permit is issued. <br /> As-builts, easement, and a one year Warrantee Bond in the amount <br /> of 10% of the cost of construction of the pubiic water system are required <br /> within 10 working days o# obtaining public water connection. <br /> �2. City streets are to be kept clear of dirt and debris during consSruction. <br /> 3. During construction, all truck traffic to and from the site within the <br /> City of E�erett sF.all be on arterial streets unless otherwise approved <br /> by the Public Works Department. <br /> J.✓ Participation in -in LID for street improvements to South Broadway <br /> / including a trasfic signal and intersecti�n improvements at the inter- <br /> section of 7th Avenue and 5outh Broadway is required. <br /> ;-Y. Participation in the program to fund the south end sanitary sewer interceptor <br /> is required. <br /> 6: A water main extension is required to provide service to this site. <br /> j��Public Works Department approval of a temporary erosion contro! plan <br /> is required before any building activities can begin. <br /> 8. On site detention is required. Drainage calculations are to be submitted <br /> with a City of Everett drainage plan submission form. <br /> AMEND CHECKLIST AS FOLLOWS: <br /> II- 13 - a, c, d and f - change to yes. <br /> INFORMATION FOR THE DEVELOPER: <br /> �A fire hydrant is required within 200 feet but not closer than 50 feet of all buildings. <br /> � <br /> 1� <br /> , . . .. �'R�XS� <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.