My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1020 SE EVERETT MALL WAY CAPITAL SAVINGS AND LOAN 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1020
>
CAPITAL SAVINGS AND LOAN
>
1020 SE EVERETT MALL WAY CAPITAL SAVINGS AND LOAN 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2019 1:53:00 PM
Creation date
2/13/2017 7:05:25 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1020
Tenant Name
CAPITAL SAVINGS AND LOAN
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To Maz•vin C. Haglund, Director of Systems Development R�CCIVED <br /> m C: .. ,.- TT <br /> Fr�oh• Clair Olivers, Associate Eng:neer ;Jll/�•� F�...���..,, � -t <br /> �<rE May 25, 1979 <br /> s�A�E�T pROI?OSED DNS FOR SAVINGS & LOAN °1TM °� E�EAE,T. E"E"ET'. w"5"iN°'°" <br /> BUILDING AT 1020 S. BRUABWAY (#110) I�AY 2 5 1919 <br /> WATER: <br /> There is a 6 C. I. main on Eroa�iway from about the East property line to the <br /> East with a 4" steel main going to the West. There is a static pressure of about <br /> 84 psi at the hydrant on the North side of Broadway about 500' N. E. of the eite. <br /> lmprovements to the distribution grid in t}ie area may be necessary to obtain <br /> required fire flows st this site. This determinatiori can be made after fir� flow <br /> requirements are developed by the Fire Marshal. <br /> SEWER: <br /> There is a 36" main on the Nortl: side of J3roadway. <br /> DRAINAGE: <br /> This site drains to Silver Lake. On-site detention will be required .�itii provision <br /> for oil and sediment removal. Surface ivater must b� received and discharged at <br /> the naturally-orcurring locations with ou+flow cunducted to the ex!sting drainage <br /> facilities or natural channel �with erosion control provided). A plan :o control <br /> eriosion during and after construction must be approved prior to commencin� site <br /> preparation. <br /> cc: Herb Boushey <br /> Celia Strong � <br /> � / ;� <br /> � � / <br /> ec � <br /> 1 �' <br />
The URL can be used to link to this page
Your browser does not support the video tag.