My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1020 SE EVERETT MALL WAY CAPITAL SAVINGS AND LOAN 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1020
>
CAPITAL SAVINGS AND LOAN
>
1020 SE EVERETT MALL WAY CAPITAL SAVINGS AND LOAN 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2019 1:53:00 PM
Creation date
2/13/2017 7:05:25 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1020
Tenant Name
CAPITAL SAVINGS AND LOAN
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 Z�.�..�.Y�� .....�..�.�.. <br /> F.�2:�:'tf''D <br /> T� Marvin C. Haglund, Director of Systems Development _ _ __ <br /> T <br /> FROM Clair Ol.ivers, Associata Engineer �-/y1 �F�- . �.:�.-� � ` �'� ? <br /> nnre May 25, i979 + <br /> . '``.� ' <br /> SUd.IECT pROPOS?�:D DNS FOIi, SAVINGS & LOAN V�TY OF E�ERETT. EVERETT. \ViSHINGTON _,,,�. <br /> BUILDING FT 102C S. BROADWAY (#110) <br /> MAY 2 5 1979 _...._ <br /> WATER: ' <br /> There ia a 6" C. I. main on Bro�dway frem about the E�.st property line to the <br /> Esst with a 4" steel main going to the West. There is a static pressure of about <br /> 84 psi at the nydrant on the North side oF Broadway about 500' N.E. of the site. <br /> Improvements to the distribution grid in the area may be necessary to obtain <br /> required fire flows at this site. This determination can be=made after fire flow <br /> requirements ara developed by the Fire Marshal. <br /> SEWER: " <br /> There is a 36" main on the North side of Broad�vay. <br /> DRAINAGE: <br /> ' This site drains to Silver Lake. O:�-site detention wi:il be required with provisiou <br /> for oil and sediment removal. Surface water must be received and discharged at <br /> the natux•ally-occurring locations with outflow conduct:ed to the existing drainage <br /> facilities or natural channel (with erosion control provided). A plan to control <br /> �riosion during and after construction must be �pproved prior to commencing site <br /> preparation. <br /> cc: He.rb Boushey <br /> Celia Strong— <br /> ec <br />
The URL can be used to link to this page
Your browser does not support the video tag.