Laserfiche WebLink
Any excaeation or cmbankmcnt bcyond thc limits indicatcd in thc plans, unless <br /> ordered Uy the Enginecr, shall not be paid far. All work and malerial requimd <br /> to return these arcas to thcir original conditions, as directed Uy thc Gnginccr, <br /> shall bc providcd by thc Contractor at his solc cxpcnsc. <br /> All areas shall be cxcavatcd, filled, and/or backfilied as necessary to comply <br /> with thc gradcs shown on thc dra�vings. In filled and backfilled arcas, fine <br /> grading shall bcgin within thc final G" of cut. Pinal grading shall produce a <br /> surFacc that is smooth and even, without aUnipl changes m grade. <br /> Contractor shall providc tcmporary drainagc to kcep thc sub-grade frce from <br /> standing water. <br /> Thc sub-grade shall be frec from rocks o� ccmentcd lumps larger than 2%z" in <br /> greatest dimension, in thc top G". <br /> Excavation for curhs and gutters shall be accomplished by culting accurately to <br /> thc cross-sections, grades, and clevations shown. Care shall be takcn not to <br /> excavate Uclow the specified grades. The Contractor shall maintain all <br /> excavations free from detrimcntal quantities of leaves, brush, sticks, trash, and <br /> other debris until final acccptancc of the work. <br /> There will Ue no separatc payment for haul on any material moved within or <br /> from [he project site and the Contractor shall include the cost of hauling in his <br /> various unii contracl prices. <br /> Acceptable cxcavated nalivc soils shall bc used for fill in the arcas reyuiring <br /> fills. Care shall be taken tc place excavated matcrial at the optimum moisturc <br /> content to achieve the spccified compaction. Any native material used for fill <br /> shall be free of organics and debris and have a maximum particic size of G'. <br /> Materials that bccome saWraled shall not Uc used for fill until tlte moislure <br /> contcnt of tite fill mects thc requirements of Scction 2-03. The maximum <br /> density and optimum moisWre content sliall bc deterniincd using the modificd <br /> proctor per ASTM D-1557. <br /> It will bc the responsibility of thc Contractor to prcvent tl�e native matcri�ils <br /> from bccoming saturated with water. If the native materials bccome saturated, <br /> it will be the responsibility of the Contractor to dry lhc materials, at his expcnse, <br /> to the optimum moisture contenL Any delays as a result of having to dry the <br /> material will not be cause for additional timc or money. <br /> Where native materials arc unacceplable for roadway (ill, unless olhenvise <br /> directcd by tlie cngineer, or shown on the plans, Uie fill material shall bc <br /> "Gravcl Borrow". Gravel 13orrow will be paid for separalely, per ton. 1'he price <br /> per ton shall indudc thc cost of hauling, placing and compacting lhc matcrial in <br /> lifts as spccificd hcrcin. <br /> �j� <br />