Laserfiche WebLink
�.p3.7_ Excavation Below Gradc <br /> Pollowing removal of lopsoil or excavalion to gradc and before placement of <br /> fills or Uase courses, the sub-grade under thc roadway shall be proof rolled to <br /> idcntify any soft or loose arcas wherc iuc suU-g�adc has Ucen disturbcd and/or <br /> whcre the density of thc naWral carih is less than lhat required by Scclion 2-03. <br /> Thc prooC roll sliall bc wilh a 15 ton stccl whceled roller. In areas wlicro thz <br /> sub-grade does not stand up to the proof roll, the sub-grade shall u � <br /> overexcavated and nativc or imported matcrial, as deterniincd by thc Enginecr, <br /> elevat on�nTh s�n aaenals hall be con pacted in act ordaneo vith Secl,ont2-p3and <br /> The proof roll as rcquired aUove for excavated portions of the road�vay shall bc <br /> considcred as incidental to Ihc contract. <br /> Thc following is inserted aller the second paragraplt: <br /> Subexcavation. At any time, ilie Engineer may order excavation bclmv sub- <br /> gradc to rcmove soft and uncompactible material. The rcplacement matcrial <br /> shall bc free draining and granular, or other matcrials as detemtined by thc <br /> Enginccr. <br /> 2-03.3 Contractor Provided Disoosal Sitc <br /> The Conlractor shall make his o�vn arrangements Cor disposal of surplus <br /> material and shall protect the City from any and all damages ansing there from. <br /> b d ten s of the ontract and nol dclido i a con pensati�onav II bc madcrespective <br /> Asbestos-cement pipe disposal practice shall confomi to the requirements of the <br /> State of Washington Deparlment of Gcology and the Snohomish County Solid <br /> Waste Division. <br /> SECTION 2-04 <br /> HAUL <br /> 2-04.1 Descrintion <br /> to,�its`final esling place on tl cnppo ect or at a wastc s te rial from ils original site <br /> 2-04.2 Construclion Requirements <br /> Off-highway carth-tnoving cqttipmcnt shall not haul o�i or across any strect not <br /> bcing improvcd in thc Contract. <br /> �� <br />