Laserfiche WebLink
7. The usc of water to perCorm cicaring work shall bc held lo a minimum unless <br /> dcsignatcd otlicrn�isc by thc Lnginecr. Thc Contractor shall providc sclf- <br /> propelled pickup sweepers for pavement clenning and debris removal <br /> whencvcr their usc is ordered Uy thc Engineec The type and nwnber of <br /> swcepers are subjcct lo ihc approval of the Engincer. <br /> S. Thc Contractor shall plan thc operalion to minimizc thc nced for strcet <br /> cleaning. <br /> 2-05.2 Dcscription <br /> This work shall consist of c;earing the pavemenl and removing dcUris from the <br /> roadway. <br /> 2-053 Measuremcnl <br /> Street cleaning will be measw'ed Uy ihe hour for the acWal iitne consumed in <br /> pavcment deaning and dcUris rcmoval. No allowance will be madc for timc <br /> consumed in making rcpairs to ihe equipment or Cor moving the equipment to or <br /> Crom the site on which the street cicaning is ordcred. No separate payment will <br /> Ue madc for water rcquired Cor the��omial operation of the p�ckup sweepers. <br /> SECTION 2-06 <br /> STRUCTURF. EXCAVATION <br /> 2-06.1 Disposll of Exc•�valcd Material <br /> All costs for disposing of excavated material, whether wilhin the project limits <br /> or hauled to a disposal sitc, shall bc incidental to �hc othcr bid itcros in thc Uid <br /> proposaL Thc City will not pay for hauling in cither casc. Any such disposal <br /> shall mect Uic rcquiremcnts of Seclion 2-03. <br /> SGCTION 2-07 <br /> 7'RI111MING AND CLN:ANUP <br /> 2-07.1 Dcscrintion <br /> During lhe process of construclion, the Contractor shall keep the project site in a <br /> ncat, ordcrly condition with as liltic disntption to thc adjoining propertics as <br /> practical undcr thc conditions. <br /> II , <br />