Laserfiche WebLink
' f1�V[VJLL ULLli1J11U111V1� Vl" I�Vp-Ji�n�Ll\���i. �� � <br /> � `t��/t� C , <br /> Descxi.ption of Propns:il ' <br /> The proposed action is the issuance of building perm�ts to all�v construction of an appror,i�nat� I� <br /> 9,100 square foot one-s[ory branch 6ank. 7'he following factors Nere considered prior tn n,.�l�i;� , <br /> a preliminary decision on this Proposa L• <br /> 1. The proposed site is zaned C-1, General Cummercial Zone, which would allow this use�. <br /> 2. An existing wood building :urrently serving as a branch bank will be demolished to :�11uw <br /> for construction. The recainder of the site is a vacant field. • <br /> 3. The site drains into the Everett Mall Detention Pond. Draina�e i�ust be designed in <br /> conforman^e with the City's Drainage Ordinance. <br /> 4. The existing bank h�s access directly to and fron South Broadway as well as the PUP ri�;ht-oi- <br /> way (entrance to the �fall just west of Sears) . An exit only to the PUD ri�ht-of-u;a}• is <br /> proposed for [he new facility (in addiCion to the alrea_'y er.isting access points) . <br /> Prononen[ ' ' <br /> Attn: John Rogers • <br /> TRA for Seattle First National Bank � • <br /> 215 Columbia Street <br /> Seattle, Ida. 98104 <br /> L'ocation oE Proposal <br /> �outh of South Broadway, West of the PUD Right-of-Way <br /> Lead A�enc��: City of Everett Planning Departnent � <br /> Contact Person: Bob Landles � Phone: 259-8731 <br /> This Proposal has been detenuined not to have a significant adverse impact on the <br /> environr.ient. an Envirorwental Impact Statement is not required under RCId 43.21C.030 (2) (c) . <br /> This decision was made after revieca by the lead agency of a completed environmental <br /> checklist and other information on iile with the lead agency. <br /> If you uish additional .information or desire �o comment regarding [his proposal, please <br /> phone tlie above number, or contact the City of Everett Ylanning Department, 3002 We[more, <br /> Everett, Washington 98201, within the fifteen day review period ending September 14, 1978. <br /> Responsible Official: Dennis Derickson <br /> Title: Planning Director <br /> a[e: August 30, 1978 <br /> c � � <br /> Signature: �. ;'jiy�/-/ ���9L=;f(�i2/ . • <br />