Laserfiche WebLink
i <br /> � � � � � �� r� � <br /> �a Herb�Eou:tihey, Director of Operations <br /> SEP 12 ly/� <br /> fNOM �lalr Olivers, Assistant �ngiaeer ���c• <br /> CITY OF EVERETT <br /> o..e September ii, 1978 Pianni��;; �.:�[. <br /> ��e��c� PROPOJED DECLARATION OP NON- cnvvreveHui evtwe*cw.�,Hiucro�, <br /> SIGNIFICANCE FOR SEA-FIRST BANK AT <br /> EVERETT MALL <br /> WATER: ' <br /> There is a 6" C.I. main on South Broadway and a 12" D.I. main easi: of the PUD <br /> right of way. The existing '-.�" service to tlie site is from South Broadway. Static <br /> pressure at the hydrant about 300' west of the site is about 84 psi. A 12" D.I. stub <br /> crossing the PUD right of way near the south property line could be used t8 provide <br /> a nearer hydrant for this site. <br /> SEWER• <br /> . , � <br /> Th=re is a main on South Broadway but the existing side sewer to this site crosses <br /> the PUD right of tivay to a manhole in the Everett Mall area. <br /> DRAINAGE: <br /> As long a� the site drains to the Mall's detention facility it should have no significant <br /> impact on 3rainage. <br /> STREETS: � <br /> The proposal should not adversely affect South Broadway or the PUD right of way road. <br /> ��� , _ <br /> . , . • o{dC ``�`O <br /> { <br /> 9' <br /> Q� ���'� <br /> ��d¢' <br /> . ��,,,�� G( ,, I � <br /> � <br /> � OD X+1'H <br /> 1 �. <br />