Laserfiche WebLink
;.;` <br /> �j <br /> FINAL DECLM,ATI0:1 OF NON-SICNIFICANCE <br /> Descrip[ion oE Proposal <br /> The proposed action is the isauance of building permits to allow conatruction of an approxima- <br /> tely 9,100 square• foot one-story branch Bank. The following factors were considered and the <br /> listed requirements were placed in response to cormnents submitted by various City Departc�ents <br /> during the Environmental Checklist Review of this Proposal: <br /> 1. The proposed site is zoned C-1, General Comm�=_rcial Zone, which would allow this use. <br /> 2. An existing wood building currently serving aa a branch bank will be demolished to allow <br /> for construction. The remainder of the site is a vacant field. <br /> 3. The site drains into the Everett Ffall Detention Pond. Drainage must be designed in <br /> conformance with the City's Drainage Ordinance. <br /> 4• The existing bank has access' directly to and from South Broadway as well as the PUD right= <br /> of-way (entrance to the Mall just west of Sears) . An exit only to the PUD right-of-way is <br /> . proposed for the new facility (in addition to the already existing access points) . <br /> 5. A fire Hydrant must be provided in conformance with Fire Department Requirements. <br /> 6. Access and parking design must be approved by the City Engineer. Driveways to public and <br /> private streets must conform to City code, and all streets must be cleaned daily in <br /> conformance with Engineering Department Checklist comments. <br /> Proponent: <br /> Attn: John Ragers ' � . �,y:-�� <br /> TRA for Seattle First National Bank , � `�`f�(� ��r'� z' <br /> 215 Columbia Street � <br /> - �J . . '; ---� =a`.-. <br /> Seattle, Wa. 98104 . � ' <br /> ' • .. . `'�2.�'._ <br /> . Location of Proposal: South of South Broadc:ay, West of the PUD Right-of-way '� ' <br /> Lead l�gency: City ��f Everett ^la�ning Department . <br /> Contact Person: Bob Landles Phone: 259-8731 <br /> This proposal has been determined not to have a significant adverse 3mpact on the <br /> env�ronment. An Envj.ronmiantal Impact Statement is no[ required under RCW 43. 21C.030(2)(c). <br /> This decision was made after review b} the lead agency of a completed environmental <br /> checklist and other l.nformation on file with the lead agency. <br /> A fifteen day review period has elapsed for this project and no adverse co�ents were <br /> received. <br /> Responsible Official: DennLs Derickson fIun)l � IC7 � C� C.'n S i� / <br /> Title: P l,a n n i n g D irec tor u u 1I <br /> SEP 2 7 1978 .. <br /> Da_[e: September 22 1978 1 <br /> --��.�. . CITY OF E\ ERETT <br /> Signature• �� n `�� ,����i� ,,�^ / 111SpCCtiCn Depr. <br /> � <br /> NOTE: This final,Decl.aration of Non-Significance may be c�ithdrac+n in ehe event of <br /> aignificant changes in this proposal. <br /> ' Y.: <br /> � <br />