My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1130 SE EVERETT MALL WAY BLDG 3 SHELL 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1130
>
BLDG 3 SHELL
>
1130 SE EVERETT MALL WAY BLDG 3 SHELL 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2019 8:29:27 AM
Creation date
2/13/2017 7:21:34 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1130
Tenant Name
BLDG 3 SHELL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Everett Mall Building 3 >heil F. _Kage <br /> 11/1/06 <br /> Page 2 ef 3 <br /> calculating as separale buildings, the area increase for frontage cannot exceed .75 of the <br /> allowabie area, as refererenced in equation 5-2 of IBC 506.02. <br /> See response to item #1. <br /> 4. The erit discharge from Tenant 'A' (exit 4) should meet lhe requirements tor an egress court less <br /> thar 10 (eet in width: 1 hour fire-resistant rated vralls and '/." hour self closing doors, per IBC <br /> 1023.5.2 for the firsl 10 feel in heighl from the (loor of lhe courl. <br /> All walls in court arp 2 hour reted. Exit door#4 has been revised to a 1 hour rated door. See <br /> sheet A09.01. <br /> 5. Two accessible means of egress snould be indicated on the drawings tor each tenant, per IBC <br /> 1U07.1. <br /> Revised Exit#2 to includo a handicap ramp through the loading dock area. See sheet A1.30 <br /> and A02.01. <br /> ti. In Exit 2, the trash compactor area could be considered an intervening space per IBC section <br /> 1013.2. A discemible path of egress should bs indicated including handrails on both sides of Uie <br /> ramp wilh landings per IBC section 1010.4 and �010.8 respectivcly. <br /> We have added a handfcap remp with handrails and landings through the compactor area. <br /> See sheet A1.30 and 13/A05.02. <br /> �. Ramps witt a rise greater than G' inches should have handrails on both sides �vhich should er.:end <br /> 12 inches horizontally beyond the top znd bollom o( the ramp runs, per IBC 1010.f1 and ICC-A'JSI <br /> 505.10.1 as accessible exils. <br /> Wc have revised the ramp at Exit 2, to show railings on both sides. See shects A1.30 and <br /> 13/A5.02. <br /> 8. Egress ramps shou!d h���� a rise of 30 inches maximum per IBC 1010.4. the elevation of ihe base <br /> of lhe ramp is not inr ,d or. ::ie exil ramp in the lrash compactor area, reference 13/a5.02. <br /> Edge proteclion is �sd at the east side of the egress ramp, per tOtO.�J. <br /> We have revised the ramp at Exit 2, to show railings on both sides. Landings have been <br /> addecl. Seo sheets A�.30, A02,01 and 13/A5.02. <br /> 9. The riser height for exit 3 exceeds allowable dimensions per IBC 1009.3. The clear width should <br /> be dimensioned so ihat the handrails do not excced the maximum protections into the clear width <br /> perlBC 1009.11.7. <br /> The stairs have been revised per required riser heighls. Clear dimensions have been added. <br /> �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.