My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1325 SE EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1325
>
BASE FILE
>
1325 SE EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2022 9:29:14 AM
Creation date
2/13/2017 7:40:07 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1325
Tenant Name
BASE FILE
Notes
BLDG A
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 4 - <br />The approxinately 27,200 square faot miscellanaous retail shops <br />building propoaed Eor Phase III muat be set back to maintain the 20 <br />foot reaervation area, or a traffic analyaia muat be provided to <br />identify an alternative acceea location which provides adequate accesa <br />for tt�e vacant parcels to the north, <br />If, at any time, an alternative access is developed which adequately <br />servea the v,lcant property to the north, the requirement for the 20 <br />foct reaervation area shall be withdrawn. Withdrawal notice shali be <br />in the form of a letter from the Planning Director. <br />7. Additional sewer flows will be generated by the proposal. <br />Participation in [he coat to fund the Area 2 Sewer Tnterceptor is <br />required. The actual coat shall be computed by the Building Department <br />per ordinance in effect at the time und according to the infarmatiun <br />Qrovided on the approved plana on the date of permit isauance. <br />3 <br />The on-site sewer main must be ,ithin an easement to the City. The <br />easement muat be submit.ted to the City prior to the occupany permit <br />isauance. <br />Inczeaeed surface weter runoff will reault from the elim.ination of the <br />wooded urea and the creation of additional impervious surface. <br />Drainagc aus[ be de�igaed ia conformance with the City's 3rainage <br />ordinance, with oil-water separators designed to meet D,O.E. water <br />quality standarda. <br />On-site detention will be raquired. <br />atructure mus[ be used to provide <br />stornis and the lesa frequent, more <br />design storm. The required volume <br />atorage d��e to wetland elimination <br />the proposed impervious surfaces. <br />A multiple orifice outlet control <br />flood protection for Less intense <br />;.ntenae s[orma; such as [he 25 year <br />of detention must include the losk <br />in addition tu increased runoff from <br />
The URL can be used to link to this page
Your browser does not support the video tag.