Laserfiche WebLink
��� <br />O <br />�� <br />>Hti <br />r <br />H � <br />�H� <br />�fpH <br />H <br />�o <br />oHa <br />��g <br />c�•• c� <br />H <br />F� <br />'Z' H <br />r <br />g�y <br />t� t7 y <br />���i <br />H O .'�i� <br />I v �" <br />Mr• Robert Landl�s <br />ppril 13, 199G <br />Page 2 <br />N7ith respect to any concerns that you may have regarding parking, <br />we have counied 289 p�rking spaces on the 3.8 acre irnst narcel. <br />�ven if there were a lo:s of 9 spac�s because of the construction <br />�f an additional loading 9ock, we would be providirig a car ratio <br />of 6.2 cars per thousand, �:hich is zilmost twice the number. of cars <br />required under current cade. <br />It is our belief that the proposal for the Toys "R" Us store would <br />�ot have a significant adverse imp,ict on the en•�ironment, that an <br />environmental i:npact statement shauld not be required and that a <br />Declaration of Non-Significance should be issued caith reyard to <br />this project. <br />It was our understanding that, because che proposed Toys "R" Us <br />project involves minor cosmetic changes to the existinq building, <br />no SEPF� revie:a wculd be re�,:ired and that we would need a buildiny <br />permit only. Because our store opening by October is necessary, <br />if we cannot obtain a waiver of SEPA review or an amendment to the <br />existing Declaration �f Non-Significance (SEPA �`22-83 (revised)), <br />the chances of a Toys "R" Us store in Everett are doubtful. <br />If after reviewing this letter. you have any questions, please <br />call Michael Nicholson, our Architectural Project Manager for <br />this project, at (201) 599-7800. <br />Thank Yo�• <br />ccar idicl:se] Nicholson <br />Very truly yours, <br />TOYS "R" US, ZNC. <br />�� � "�' <br />RAL B. CZZTROM <br />Regional Re�.l Estate Manger <br />