My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1402 SE EVERETT MALL WAY FREDERICK AND NELSON 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1402
>
FREDERICK AND NELSON
>
1402 SE EVERETT MALL WAY FREDERICK AND NELSON 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2022 5:37:21 PM
Creation date
2/13/2017 7:54:24 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1402
Tenant Name
FREDERICK AND NELSON
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/( EVER 'TT MALL EXPANSION <br />September 21, 1979 <br />Information to help clarify requirements of the Checklist prior to approval <br />of Building Permits and Occupancy for the Everett Mall expansion. <br />Prior to approval of Building Permit the applican'r is required to: <br />1. Submit legally executed Warranty Deed for 60 feet of Public Right Of _ <br />Way connecting South Broadway to existing 100th Street Right -Of Way <br />(North/South Arterial). Location of Right Of Way shall receive approval <br />from City Public Works- Department and Planning Department. <br />2. Submit legally executed Powers -Of -Attorney attached: y, ll <br />1 in <br />a. for LID improvement to North/South Arterial (this POA may contain i1 <br />a limiting clause that it can not be used unless the P.IJ.D. corridor ,,.f i T^ <br />is closed as an arterial). Total costs for new street about 200 per �T7' <br />linear foot*. Vrh'�% <br />b. for L.I.D. improvements to South Broadway. Total costs for improve- 1 <br />ment about $120 per linear foot*. �,b� <br />c. for L.T.D. improvements to 100th Street. Total cost for improve,•nent �, 1. <br />about $30 per foot PLUS $60 to $80,000 for signal at 7th Ave. & / <br />100th *. <br />NOTE: The City of Everett. is relying upon ^ ovisions contained in R.C.W. 35.43 1 <br />and 35.44 and the Public Hearing process to -determine costs fo tenefited Y' <br />properties within L.I.D.'Boundaries (which are not yet established) for <br />the above L.I.D. costs. <br />3.- .Approved Plans for improvements to PU.D. arterial corridor from South <br />Broadway to 100th Street Right Of. Way including all necessary improve- . <br />ments to bring the corridor up to City Standards; those improvements" <br />shall include drainage corrections, asphalt repair, unobstructed sidewalks <br />and handicap curb ramps, channelization, stop signs, and pavement markings <br />at all intersections. Plans shall include ownership lines. <br />Submit legally executed Sub -lease (or document acceptable to the City) <br />relinquishing all private interest in the P.IJ.D. -- Mall North/South <br />arterial corridor to the City for maintenance and enforcement purposes. <br />COSTS DEPEND ON MAGNITUDE OF PROPOSAL <br />4. Approved Plans for internal traffic circulation (directional arrows, stop <br />bars, lane lines) include drain age "corrections, asphalt repair, bicycle racks,bus <br />schedule/route information racks. <br />5. Traffic signal is required to be installed prior to occupancy at the C_ .1tral <br />Mall entrance, details not available at this time, but shall be worked <br />out with City prior to building permits being issued .............. <br />COSTS UNKNOWN AT THIS TIME, PROBABLY IN THE $60,000 +o <br />6. Traffic Signal is required at the existing P.O.D./South Broadway inter- <br />section (or as relocated, to new right-of-way). This signal installation <br />is required at such time as it is determined necessary by the Public <br />
The URL can be used to link to this page
Your browser does not support the video tag.