My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1402 SE EVERETT MALL WAY FREDERICK AND NELSON 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1402
>
FREDERICK AND NELSON
>
1402 SE EVERETT MALL WAY FREDERICK AND NELSON 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2022 5:37:21 PM
Creation date
2/13/2017 7:54:24 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1402
Tenant Name
FREDERICK AND NELSON
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � c <br />Works Director. The actual installation is not required prior to issuance <br />of permits or: occupancy; HOWEVER, a written agreement (acceptable <br />to the City Attorney) providing for compliance with this condition is <br />required prior to issuance of a building permit. <br />7. Agreement (acceptable to the City Attorney) for compliance with commuter <br />pool, bus information, car pool preferential parking required prior to <br />approval of Building permits. <br />COSTS TO APPLICANT UNKNOWN* <br />8. Grading and Excavation Permit has been issued. <br />9. Partial Public Works Permit (known as Right -Of -Way Use Permit) has <br />been issued allowing installation of Water, Sewer, andStorm pipes (does <br />not include detention pond). Detention pond for• expansion is acceptable <br />as described but will not be approved without plans showing proposed <br />modifications to existing pond to restore its ability to function effectively.. <br />No Building permits will be approved until such plan is approved. <br />. . e <br />10. Snohomish County will be making a presentation to City Council October - <br />17, 1979 for the North Creek Drainage Basin. The presentation is a proposal <br />that a drainage plan to be prepared and methods for financing be explored. <br />EXTENT OF IMPROVEMENT UNKNOWN AT THIS TIME... COSTS UNKNOWN <br />AT THIS TIME. It is expected but not assured that any L.I.D. formed <br />for a comE ehensive drainage system would credit properties with existing <br />operational control systems for the existing control system. Again the <br />L.I.D. assessment process is a public hearing process governed by R.C.N. <br />35.43 do 44. <br />11. The South End Sanitary Sewer Interception charges still require City <br />Council concurrence; however, the figure is expected to be $716 per <br />gallon per minute discharged plus $204 per gallon per minute peak as <br />calculated by standard calculating methods acceptable to Public Works <br />Director. GPM be GPM Peak to be provided by Applicant and approved <br />by City. <br />No Engineering estimatehas been prepared for these improvements. Costs are <br />extrapolated from current similar projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.