Laserfiche WebLink
� � c <br />Works Director. The actual installation is not required prior to issuance <br />of permits or: occupancy; HOWEVER, a written agreement (acceptable <br />to the City Attorney) providing for compliance with this condition is <br />required prior to issuance of a building permit. <br />7. Agreement (acceptable to the City Attorney) for compliance with commuter <br />pool, bus information, car pool preferential parking required prior to <br />approval of Building permits. <br />COSTS TO APPLICANT UNKNOWN* <br />8. Grading and Excavation Permit has been issued. <br />9. Partial Public Works Permit (known as Right -Of -Way Use Permit) has <br />been issued allowing installation of Water, Sewer, andStorm pipes (does <br />not include detention pond). Detention pond for• expansion is acceptable <br />as described but will not be approved without plans showing proposed <br />modifications to existing pond to restore its ability to function effectively.. <br />No Building permits will be approved until such plan is approved. <br />. . e <br />10. Snohomish County will be making a presentation to City Council October - <br />17, 1979 for the North Creek Drainage Basin. The presentation is a proposal <br />that a drainage plan to be prepared and methods for financing be explored. <br />EXTENT OF IMPROVEMENT UNKNOWN AT THIS TIME... COSTS UNKNOWN <br />AT THIS TIME. It is expected but not assured that any L.I.D. formed <br />for a comE ehensive drainage system would credit properties with existing <br />operational control systems for the existing control system. Again the <br />L.I.D. assessment process is a public hearing process governed by R.C.N. <br />35.43 do 44. <br />11. The South End Sanitary Sewer Interception charges still require City <br />Council concurrence; however, the figure is expected to be $716 per <br />gallon per minute discharged plus $204 per gallon per minute peak as <br />calculated by standard calculating methods acceptable to Public Works <br />Director. GPM be GPM Peak to be provided by Applicant and approved <br />by City. <br />No Engineering estimatehas been prepared for these improvements. Costs are <br />extrapolated from current similar projects. <br />