Laserfiche WebLink
Pl/BL/C WOMAE9 <br />September 27, 2013 <br />Mr. John M. Roberts <br />Precision Exhaust <br />33780 Mills Road, Ste B <br />Avon, OH 44011 <br />Project: Express Japan TI <br />Job Address: 1402 SE Everett Mall Way, Food Court #623 <br />Plan Review No: B1309-011, M1309-022, K1309-003 <br />Dear Mr. Roberts, <br />In response to your application for a construction permit, your plans have been examined and you are advised <br />that revisions may be necessary before a permit can be issued. Please review and respond to the comments <br />below. All required submittals must be of sufficient detail and information to ensure that the proposed <br />structure will be co.­,-tr cted in compliance with all adopted codes. <br />In order for the pr!- :-essing of your application to continue, it wi6 be necessary to provide the Building Division <br />with two sets o' c.: nstruction documents reflecting the corrections requested. Those revised sheets can be <br />sent by e-mail to=xpedite processing. <br />Construction (61309-012 and M1309-022) <br />1. Vision lights on doors should be shown as minimum 66 inches above the floor or maximum 13 inches <br />above the floor to the bottom of the vision panel, per ICC A117.1-2009 Section 404.2.10. <br />2. The combustible wall construction shown on the food court side of the hood requires 18 inches of <br />clearance, per IMC 507.9. Alternatively, the following options can be shown on the drawings: <br />i. A letter from the testing facility, on their letterhead, to a proprietary Type I hood <br />manufacturer is required to reduce the clearance to combustible construction to zero <br />clearance. Note that testing to UL 710 alone does not eliminate Type I hood combustible <br />clearances, reference exception 1 to IMC section 507.1. The mechanical drawings should <br />indicate the name of the proprietary hood manufacturer that corresponds to the testing <br />facility report AND the section showing the construction required `or zero clearances per the <br />testing report; or, <br />ii. One of the clearance reduction methods shown in IMC Table 308.6 for vertical combustible <br />assemblies from 18 inches to 6 inches should be shown on the drawings behind the lighting <br />and proposed translucent plex panels; or; <br />iii. The detail is changed to all non-combustible. materials mounted on a traditional drywall and <br />metal stud partition, behind the hood, including the standard three inch baffle for the hood <br />construction. Drywall should be shown on the drawings attached to both sides of the metal <br />stud, with stainless steel on the hood side of the drywall attached the metal stud. <br />/3. The listed assembly for the grease duct enclosure system of one hour resistant grease duct fire wrap <br />(typically two layers is required by the testing facility) should be shown to meet the requirements of <br />ASTM E 2336, with the required clearances shown on the drawings, per IMC section 506.3.6, exception <br />3. <br />i?2 <br />