Laserfiche WebLink
C:! H <br />C', <br />9Hrn <br />H�H-1 <br />y f/JH <br />z <br />3 0 . <br />Ha <br />0Haa <br />Hl0 <br />ZH <br />CH <br />HH <br />gy H <br />0a(4 <br />zHrn <br />H O rn <br />lmftA� <br />MEETING MINUTES <br />DATE HELD: November 12, 1991, 2:30 p.m. <br />SUBJECT: Mervyn's - Everett Mall <br />Frederick & Nelson Takeover <br />SSOE Job No. 916250-00 <br />LOCATION: City of Everett <br />Building Division <br />3200 Cedar Street <br />Everett, WA 98201 <br />ATTENDANCE: Tim'Tyler, Building Official -Everett <br />Jeffrey S. McFall, Assoc. Eng./Bldg.-Everett <br />Gayle Sherman, Mervyn's <br />Bob Meta, Mervyn's <br />Kim Procunier, SSOE <br />John Hux, SSOE <br />DISTRIBUTION: All in Attendance <br />Ken Hanson, SSOE-Troy <br />T. Baker, SSOE-Nashville <br />T. Clevenger, SSOE-Nashville <br />D. Welch, SSOE-Troy <br />Brian Ritchhart, SSOE-Bellevue <br />File <br />n�'�� tf �r,?NOV 25 1991 lJ <br />CITY OF EVERETT <br />Public'Works Dept. <br />1. Signage permits will be required 3-4 weeks review period. Two sets of drawings <br />Steve Ingelsbee - Zoning (206) 259-8731 <br />SSOE to check with mall for their review requirements. <br />2. Demolition plans can be submitted over counter for permitting. <br />3. Re -roof permit available - 1 week review period. <br />4. Everett building official shall review use of existing exit door from Mervyn's into mall <br />corridor and advise SSOE. <br />5. Classification of building type to be determined by Everett building official. <br />6. Everett Publi_ Works to check on backflow preventor requirements for domestic water <br />service. <br />7. Fire alarm signaling - local alarm only is acceptable. <br />8. No smoke evacuation system exists and none required. <br />9. Second floor location for toilet rooms is acceptable. <br />10. Compliance codes: 1988 U.B.C., U.P.0 and U.M.C. <br />1988 U.F.0 unamended <br />SSOE, INC. • 200 MOTT FOUNDATION BUILDING • FLINT, MICHIGAN 48502 <br />t. <br />